Performa SoP 003 B: APPENDIX-B (already in the SoP regulation) | ||||||||||||||||
REGISTER FOR COMPILING THE COMPLAINTS CLASSIFICATIONWISE | ||||||||||||||||
Name of Area / Circle | Classification | Pending complaints of previous Qtr | Complaints received during the Qtr | Total Complaints | No. of Complaints redressed during the Qtr | Balance Complaints to
be redressed (5) – (10) |
||||||||||
In stipulated time | Beyond stipulated time | Total (6) to (9) | ||||||||||||||
Within 50% of stipulated time. | Within stipulated time. | Up to double the stipulated time | More than double the stipulated time | |||||||||||||
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | ||||||
PGVCL | A(i) | Loose connections from pole | 15 | 121699 | 121714 | 67873 | 53208 | 459 | 159 | 121699 | 15 | |||||
A(ii) | Interruption due to line breakdown | 13 | 81580 | 81593 | 50414 | 30800 | 273 | 97 | 81584 | 9 | ||||||
A(iii) | Interruption due to failure of transformer | 19 | 22341 | 22360 | 10780 | 10731 | 781 | 58 | 22350 | 10 | ||||||
B(i) | Ordinary case, which requires no augmentation. | 4 | 2740 | 2744 | 1644 | 1064 | 30 | 0 | 2738 | 6 | ||||||
B(ii) | Where augmentation is required. | 2 | 2567 | 2569 | 1292 | 1229 | 39 | 7 | 2567 | 2 | ||||||
C(i) | Stopped/Defective Meters | 12 | 21852 | 21864 | 11323 | 10349 | 152 | 27 | 21851 | 13 | ||||||
C(ii) | Billing on average basis for more than two bills | 4 | 6319 | 6323 | 3756 | 2444 | 102 | 14 | 6316 | 7 | ||||||
D(i) | Loose Wires | 16 | 11079 | 11095 | 6645 | 4246 | 144 | 41 | 11076 | 19 | ||||||
D(ii) | Inadequate ground clearance | 1 | 2010 | 2011 | 1215 | 750 | 38 | 7 | 2010 | 1 | ||||||
E(i) | For current bills where no additional information is required | 1 | 4601 | 4602 | 2689 | 1856 | 37 | 19 | 4601 | 1 | ||||||
E(ii) | Where additional information relating to correctness of reading etc. is required | 9 | 5150 | 5159 | 3029 | 2104 | 13 | 4 | 5150 | 9 | ||||||
F(i) | Where extension of mains is not required | 2 | 2755 | 2757 | 1842 | 846 | 52 | 15 | 2755 | 2 | ||||||
F(ii) | Where extension of mains is required | 1 | 1810 | 1811 | 1015 | 752 | 30 | 13 | 1810 | 1 | ||||||
F(iii) | Modification in connected load | 7 | 4670 | 4677 | 2643 | 1887 | 105 | 35 | 4670 | 7 | ||||||
F(iv) | Name change/reconnection | 9 | 11411 | 11420 | 7494 | 3866 | 33 | 14 | 11407 | 13 | ||||||
G | Refund of amount due in regard to temporary connection | 5 | 2482 | 2487 | 1183 | 1277 | 21 | 0 | 2481 | 6 | ||||||
H | Others | 11 | 25941 | 25952 | 16515 | 9057 | 288 | 84 | 25944 | 8 | ||||||
131 | 331007 | 331138 | 191352 | 136466 | 2597 | 594 | 331009 | 129 |