Performa SoP 003 B: APPENDIX-B (already in the SoP regulation)
REGISTER FOR COMPILING THE COMPLAINTS CLASSIFICATIONWISE
Name of Area / Circle Classification Pending complaints of previous Qtr Complaints received during the Qtr Total Complaints No. of Complaints redressed during the Qtr Balance Complaints to be redressed
(5) – (10)
In stipulated time Beyond stipulated time Total (6) to (9)
Within 50% of stipulated time. Within stipulated time. Up to double the stipulated time More than double the stipulated time
1 2   3 4 5 6 7 8 9 10 11  
PGVCL A(i) Loose connections from pole 15 121699 121714 67873 53208 459 159 121699 15
A(ii) Interruption due to line breakdown 13 81580 81593 50414 30800 273 97 81584 9
A(iii) Interruption due to failure of transformer 19 22341 22360 10780 10731 781 58 22350 10
B(i) Ordinary case, which requires no augmentation. 4 2740 2744 1644 1064 30 0 2738 6
B(ii) Where augmentation is required. 2 2567 2569 1292 1229 39 7 2567 2
C(i) Stopped/Defective Meters 12 21852 21864 11323 10349 152 27 21851 13
C(ii) Billing on average basis for more than two bills 4 6319 6323 3756 2444 102 14 6316 7
D(i) Loose Wires 16 11079 11095 6645 4246 144 41 11076 19
D(ii) Inadequate ground clearance 1 2010 2011 1215 750 38 7 2010 1
E(i) For current bills where no additional information is required 1 4601 4602 2689 1856 37 19 4601 1
E(ii) Where additional information relating to correctness of reading etc. is required 9 5150 5159 3029 2104 13 4 5150 9
F(i) Where extension of mains is not required 2 2755 2757 1842 846 52 15 2755 2
F(ii) Where extension of mains is required 1 1810 1811 1015 752 30 13 1810 1
F(iii) Modification in connected load 7 4670 4677 2643 1887 105 35 4670 7
F(iv) Name change/reconnection 9 11411 11420 7494 3866 33 14 11407 13
G Refund of amount due in regard to temporary connection 5 2482 2487 1183 1277 21 0 2481 6
H Others 11 25941 25952 16515 9057 288 84 25944 8
131 331007 331138 191352 136466 2597 594 331009 129