Performa SoP 003 B: APPENDIX-B (already in the SoP regulation)
REGISTER FOR COMPILING THE COMPLAINTS CLASSIFICATIONWISE
Name of Area / Circle Classification Pending complaints of previous Qtr Complaints received during the Qtr Total Complaints No. of Complaints redressed during the Qtr Balance Complaints to be redressed
(5) – (10)
In stipulated time Beyond stipulated time Total (6) to (9)
Within 50% of stipulated time. Within stipulated time. Up to double the stipulated time More than double the stipulated time
1 2   3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00 11.00  
RJC A(i) Loose connections from pole 0.00 19900.00 19900.00 11211.00 8442.00 200.00 47.00 19900.00 0.00
A(ii) Interruption due to line breakdown 0.00 1952.00 1952.00 610.00 1333.00 9.00 0.00 1952.00 0.00
A(iii) Interruption due to failure of transformer 0.00 567.00 567.00 233.00 334.00 0.00 0.00 567.00 0.00
B(i) Ordinary case, which requires no augmentation. 0.00 68.00 68.00 36.00 32.00 0.00 0.00 68.00 0.00
B(ii) Where augmentation is required. 0.00 53.00 53.00 26.00 27.00 0.00 0.00 53.00 0.00
C(i) Stopped/Defective Meters 0.00 1665.00 1665.00 810.00 855.00 0.00 0.00 1665.00 0.00
C(ii) Billing on average basis for more than two bills 11.00 668.00 679.00 339.00 335.00 0.00 0.00 674.00 5.00
D(i) Loose Wires 0.00 221.00 221.00 54.00 167.00 0.00 0.00 221.00 0.00
D(ii) Inadequate ground clearance 0.00 2.00 2.00 2.00 0.00 0.00 0.00 2.00 0.00
E(i) For current bills where no additional information is required 0.00 226.00 226.00 74.00 152.00 0.00 0.00 226.00 0.00
E(ii) Where additional information relating to correctness of reading etc. is required 0.00 145.00 145.00 63.00 82.00 0.00 0.00 145.00 0.00
F(i) Where extension of mains is not required 0.00 314.00 314.00 47.00 267.00 0.00 0.00 314.00 0.00
F(ii) Where extension of mains is required 0.00 358.00 358.00 225.00 124.00 9.00 0.00 358.00 0.00
F(iii) Modification in connected load 0.00 286.00 286.00 121.00 165.00 0.00 0.00 286.00 0.00
F(iv) Name change/reconnection 26.00 1725.00 1751.00 565.00 1150.00 0.00 0.00 1715.00 36.00
G Refund of amount due in regard to temporary connection 12.00 77.00 89.00 21.00 56.00 0.00 0.00 77.00 12.00
H Others 14.00 101.00 115.00 59.00 42.00 0.00 0.00 101.00 14.00
RJR A(i) Loose connections from pole 0.00 2946.00 2946.00 1272.00 1674.00 0.00 0.00 2946.00 0.00
A(ii) Interruption due to line breakdown 0.00 2751.00 2751.00 1826.00 925.00 0.00 0.00 2751.00 0.00
A(iii) Interruption due to failure of transformer 0.00 1223.00 1223.00 455.00 768.00 0.00 0.00 1223.00 0.00
B(i) Ordinary case, which requires no augmentation. 9.00 51.00 60.00 16.00 35.00 0.00 0.00 51.00 9.00
B(ii) Where augmentation is required. 0.00 52.00 52.00 29.00 23.00 0.00 0.00 52.00 0.00
C(i) Stopped/Defective Meters 0.00 2008.00 2008.00 1456.00 552.00 0.00 0.00 2008.00 0.00
C(ii) Billing on average basis for more than two bills 5.00 4.00 9.00 2.00 2.00 0.00 0.00 4.00 5.00
D(i) Loose Wires 0.00 2292.00 2292.00 1572.00 720.00 0.00 0.00 2292.00 0.00
D(ii) Inadequate ground clearance 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
E(i) For current bills where no additional information is required 0.00 65.00 65.00 60.00 5.00 0.00 0.00 65.00 0.00
E(ii) Where additional information relating to correctness of reading etc. is required 0.00 1527.00 1527.00 871.00 656.00 0.00 0.00 1527.00 0.00
F(i) Where extension of mains is not required 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
F(ii) Where extension of mains is required 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
F(iii) Modification in connected load 0.00 75.00 75.00 58.00 17.00 0.00 0.00 75.00 0.00
F(iv) Name change/reconnection 11.00 1050.00 1061.00 744.00 300.00 0.00 0.00 1044.00 17.00
G Refund of amount due in regard to temporary connection 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
H Others 28.00 200.00 228.00 80.00 148.00 0.00 0.00 228.00 0.00
MRB A(i) Loose connections from pole 0.00 3933.00 3933.00 2663.00 1270.00 0.00 0.00 3933.00 0.00
A(ii) Interruption due to line breakdown 0.00 7290.00 7290.00 2932.00 4358.00 0.00 0.00 7290.00 0.00
A(iii) Interruption due to failure of transformer 0.00 462.00 462.00 255.00 207.00 0.00 0.00 462.00 0.00
B(i) Ordinary case, which requires no augmentation. 0.00 20.00 20.00 8.00 12.00 0.00 0.00 20.00 0.00
B(ii) Where augmentation is required. 0.00 40.00 40.00 16.00 24.00 0.00 0.00 40.00 0.00
C(i) Stopped/Defective Meters 0.00 2073.00 2073.00 681.00 1392.00 0.00 0.00 2073.00 0.00
C(ii) Billing on average basis for more than two bills 6.00 239.00 245.00 125.00 120.00 0.00 0.00 245.00 0.00
D(i) Loose Wires 0.00 623.00 623.00 225.00 398.00 0.00 0.00 623.00 0.00
D(ii) Inadequate ground clearance 0.00 3.00 3.00 2.00 1.00 0.00 0.00 3.00 0.00
E(i) For current bills where no additional information is required 11.00 736.00 747.00 421.00 321.00 0.00 0.00 742.00 5.00
E(ii) Where additional information relating to correctness of reading etc. is required 0.00 395.00 395.00 202.00 193.00 0.00 0.00 395.00 0.00
F(i) Where extension of mains is not required 0.00 60.00 60.00 33.00 27.00 0.00 0.00 60.00 0.00
F(ii) Where extension of mains is required 0.00 130.00 130.00 45.00 85.00 0.00 0.00 130.00 0.00
F(iii) Modification in connected load 0.00 125.00 125.00 55.00 70.00 0.00 0.00 125.00 0.00
F(iv) Name change/reconnection 10.00 592.00 602.00 215.00 382.00 0.00 0.00 597.00 5.00
G Refund of amount due in regard to temporary connection 3.00 7.00 10.00 5.00 4.00 0.00 0.00 9.00 1.00
H Others 10.00 1164.00 1174.00 458.00 710.00 0.00 0.00 1168.00 6.00
PBR A(i) Loose connections from pole 0.00 6287.00 6287.00 3429.00 2858.00     6287.00 0.00
A(ii) Interruption due to line breakdown 0.00 4957.00 4957.00 3161.00 1796.00     4957.00 0.00
A(iii) Interruption due to failure of transformer 0.00 1429.00 1429.00 741.00 688.00     1429.00 0.00
B(i) Ordinary case, which requires no augmentation. 0.00 94.00 94.00 51.00 43.00     94.00 0.00
B(ii) Where augmentation is required. 0.00 64.00 64.00 29.00 35.00     64.00 0.00
C(i) Stopped/Defective Meters 0.00 1138.00 1138.00 711.00 427.00     1138.00 0.00
C(ii) Billing on average basis for more than two bills 0.00 1139.00 1139.00 691.00 448.00     1139.00 0.00
D(i) Loose Wires 0.00 618.00 618.00 429.00 189.00     618.00 0.00
D(ii) Inadequate ground clearance 0.00 267.00 267.00 143.00 124.00     267.00 0.00
E(i) For current bills where no additional information is required 0.00 856.00 856.00 468.00 388.00     856.00 0.00
E(ii) Where additional information relating to correctness of reading etc. is required 0.00 689.00 689.00 329.00 360.00     689.00 0.00
F(i) Where extension of mains is not required 0.00 181.00 181.00 89.00 92.00     181.00 0.00
F(ii) Where extension of mains is required 0.00 233.00 233.00 159.00 74.00     233.00 0.00
F(iii) Modification in connected load 0.00 451.00 451.00 233.00 218.00     451.00 0.00
F(iv) Name change/reconnection 0.00 269.00 269.00 183.00 86.00     269.00 0.00
G Refund of amount due in regard to temporary connection 0.00 186.00 186.00 77.00 109.00     186.00 0.00
H Others 0.00 528.00 528.00 398.00 130.00     528.00 0.00
JMN A(i) Loose connections from pole 5.00 2712.00 2717.00 816.00 1901.00     2717.00 0.00
A(ii) Interruption due to line breakdown 7.00 1076.00 1083.00 325.00 758.00     1083.00 0.00
A(iii) Interruption due to failure of transformer 0.00 1020.00 1020.00 306.00 714.00     1020.00 0.00
B(i) Ordinary case, which requires no augmentation. 6.00 190.00 196.00 59.00 137.00     196.00 0.00
B(ii) Where augmentation is required. 3.00 51.00 54.00 17.00 37.00     54.00 0.00
C(i) Stopped/Defective Meters 3.00 524.00 527.00 158.00 369.00     527.00 0.00
C(ii) Billing on average basis for more than two bills 2.00 426.00 428.00 129.00 299.00     428.00 0.00
D(i) Loose Wires 5.00 424.00 429.00 129.00 300.00     429.00 0.00
D(ii) Inadequate ground clearance 0.00 0.00 0.00 0.00 0.00     0.00 0.00
E(i) For current bills where no additional information is required 0.00 0.00 0.00 0.00 0.00     0.00 0.00
E(ii) Where additional information relating to correctness of reading etc. is required 0.00 128.00 128.00 39.00 89.00     128.00 0.00
F(i) Where extension of mains is not required 0.00 271.00 271.00 82.00 189.00     271.00 0.00
F(ii) Where extension of mains is required 7.00 0.00 7.00 2.00 5.00     7.00 0.00
F(iii) Modification in connected load 2.00 0.00 2.00 1.00 1.00     2.00 0.00
F(iv) Name change/reconnection 0.00 423.00 423.00 127.00 296.00     423.00 0.00
G Refund of amount due in regard to temporary connection 0.00 201.00 201.00 61.00 140.00     201.00 0.00
H Others 2.00 0.00 2.00 1.00 1.00     2.00 0.00
BHJ A(i) Loose connections from pole 0.00 4716.00 4716.00 80.00 4636.00 0.00 0.00 4716.00 0.00
A(ii) Interruption due to line breakdown 0.00 3084.00 3084.00 10.00 3074.00 0.00 0.00 3084.00 0.00
A(iii) Interruption due to failure of transformer 0.00 1749.00 1749.00 12.00 1737.00 0.00 0.00 1749.00 0.00
B(i) Ordinary case, which requires no augmentation. 0.00 220.00 220.00 1.00 219.00 0.00 0.00 220.00 0.00
B(ii) Where augmentation is required. 0.00 329.00 329.00 4.00 325.00 0.00 0.00 329.00 0.00
C(i) Stopped/Defective Meters 0.00 1136.00 1136.00 3.00 1133.00 0.00 0.00 1136.00 0.00
C(ii) Billing on average basis for more than two bills 0.00 310.00 310.00 2.00 308.00 0.00 0.00 310.00 0.00
D(i) Loose Wires 0.00 2482.00 2482.00 2.00 2480.00 0.00 0.00 2482.00 0.00
D(ii) Inadequate ground clearance 0.00 260.00 260.00 0.00 260.00 0.00 0.00 260.00 0.00
E(i) For current bills where no additional information is required 0.00 497.00 497.00 0.00 497.00 0.00 0.00 497.00 0.00
E(ii) Where additional information relating to correctness of reading etc. is required 8.00 481.00 489.00 0.00 471.00 0.00 0.00 471.00 18.00
F(i) Where extension of mains is not required 0.00 169.00 169.00 3.00 166.00 0.00 0.00 169.00 0.00
F(ii) Where extension of mains is required 0.00 451.00 451.00 0.00 451.00 0.00 0.00 451.00 0.00
F(iii) Modification in connected load 0.00 866.00 866.00 0.00 866.00 0.00 0.00 866.00 0.00
F(iv) Name change/reconnection 0.00 1605.00 1605.00 11.00 1594.00 0.00 0.00 1605.00 0.00
G Refund of amount due in regard to temporary connection 0.00 213.00 213.00 0.00 210.00 0.00 0.00 210.00 3.00
H Others 0.00 546.00 546.00 0.00 546.00 0.00 0.00 546.00 0.00
JND A(i) Loose connections from pole 0.00 9999.00 9999.00 5600.00 4391.00 7.00 1.00 9999.00 0.00
A(ii) Interruption due to line breakdown 0.00 3188.00 3188.00 1593.00 1590.00 5.00 0.00 3188.00 0.00
A(iii) Interruption due to failure of transformer 0.00 1342.00 1342.00 583.00 756.00 3.00 0.00 1342.00 0.00
B(i) Ordinary case, which requires no augmentation. 0.00 165.00 165.00 68.00 97.00 0.00 0.00 165.00 0.00
B(ii) Where augmentation is required. 0.00 74.00 74.00 24.00 50.00 0.00 0.00 74.00 0.00
C(i) Stopped/Defective Meters 0.00 1083.00 1083.00 431.00 627.00 25.00 0.00 1083.00 0.00
C(ii) Billing on average basis for more than two bills 0.00 184.00 184.00 57.00 127.00 0.00 0.00 184.00 0.00
D(i) Loose Wires 0.00 1107.00 1107.00 512.00 594.00 1.00 0.00 1107.00 0.00
D(ii) Inadequate ground clearance 0.00 312.00 312.00 126.00 186.00 0.00 0.00 312.00 0.00
E(i) For current bills where no additional information is required 0.00 145.00 145.00 53.00 92.00 0.00 0.00 145.00 0.00
E(ii) Where additional information relating to correctness of reading etc. is required 0.00 164.00 164.00 71.00 93.00 0.00 0.00 164.00 0.00
F(i) Where extension of mains is not required 5.00 116.00 121.00 41.00 75.00 0.00 0.00 116.00 5.00
F(ii) Where extension of mains is required 0.00 154.00 154.00 24.00 130.00 0.00 0.00 154.00 0.00
F(iii) Modification in connected load 0.00 407.00 407.00 124.00 283.00 0.00 0.00 407.00 0.00
F(iv) Name change/reconnection 17.00 369.00 386.00 108.00 278.00 0.00 0.00 386.00 0.00
G Refund of amount due in regard to temporary connection 3.00 72.00 75.00 22.00 47.00 0.00 0.00 69.00 6.00
H Others 0.00 134.00 134.00 40.00 94.00 0.00 0.00 134.00 0.00
BVN A(i) Loose connections from pole 0.00 24710.00 24710.00 17839.65 6652.35 208.00 10.00 24710.00 0.00
A(ii) Interruption due to line breakdown 0.00 3083.00 3083.00 1804.00 1169.00 94.00 16.00 3083.00 0.00
A(iii) Interruption due to failure of transformer 0.00 959.00 959.00 605.00 336.00 18.00 0.00 959.00 0.00
B(i) Ordinary case, which requires no augmentation. 0.00 154.00 154.00 68.00 84.00 2.00 0.00 154.00 0.00
B(ii) Where augmentation is required. 0.00 94.00 94.00 64.00 30.00 0.00 0.00 94.00 0.00
C(i) Stopped/Defective Meters 0.00 2007.00 2007.00 1180.00 800.00 27.00 0.00 2007.00 0.00
C(ii) Billing on average basis for more than two bills 0.00 1544.00 1544.00 846.00 688.00 10.00 0.00 1544.00 0.00
D(i) Loose Wires 0.00 1216.00 1216.00 571.00 640.00 5.00 0.00 1216.00 0.00
D(ii) Inadequate ground clearance 0.00 377.00 377.00 146.00 220.00 11.00 0.00 377.00 0.00
E(i) For current bills where no additional information is required 0.00 236.00 236.00 107.00 129.00 0.00 0.00 236.00 0.00
E(ii) Where additional information relating to correctness of reading etc. is required 0.00 1325.00 1325.00 862.00 463.00 0.00 0.00 1325.00 0.00
F(i) Where extension of mains is not required 0.00 884.00 884.00 660.75 223.25 0.00 0.00 884.00 0.00
F(ii) Where extension of mains is required 0.00 473.00 473.00 233.20 235.80 4.00 0.00 473.00 0.00
F(iii) Modification in connected load 0.00 478.00 478.00 256.95 218.05 3.00 0.00 478.00 0.00
F(iv) Name change/reconnection 0.00 4133.00 4133.00 3220.60 912.40 0.00 0.00 4133.00 0.00
G Refund of amount due in regard to temporary connection 0.00 185.00 185.00 102.40 81.60 1.00 0.00 185.00 0.00
H Others 0.00 1024.00 1024.00 603.00 421.00 0.00 0.00 1024.00 0.00
BTD A(i) Loose connections from pole 31.00 1128.00 1159.00 427.00 732.00     1159.00 0.00
A(ii) Interruption due to line breakdown 2.00 445.00 447.00 269.00 178.00     447.00 0.00
A(iii) Interruption due to failure of transformer 0.00 327.00 327.00 197.00 130.00     327.00 0.00
B(i) Ordinary case, which requires no augmentation. 0.00 9.00 9.00 6.00 3.00     9.00 0.00
B(ii) Where augmentation is required. 0.00 10.00 10.00 6.00 4.00     10.00 0.00
C(i) Stopped/Defective Meters 11.00 395.00 406.00 240.00 160.00     400.00 6.00
C(ii) Billing on average basis for more than two bills 13.00 122.00 135.00 81.00 54.00     135.00 0.00
D(i) Loose Wires 1.00 120.00 121.00 72.00 47.00     119.00 2.00
D(ii) Inadequate ground clearance 1.00 5.00 6.00 4.00 2.00     6.00 0.00
E(i) For current bills where no additional information is required 1.00 6.00 7.00 5.00 2.00     7.00 0.00
E(ii) Where additional information relating to correctness of reading etc. is required 0.00 0.00 0.00 0.00 0.00     0.00 0.00
F(i) Where extension of mains is not required 0.00 0.00 0.00 0.00 0.00     0.00 0.00
F(ii) Where extension of mains is required 0.00 0.00 0.00 0.00 0.00     0.00 0.00
F(iii) Modification in connected load 2.00 60.00 62.00 35.00 23.00     58.00 4.00
F(iv) Name change/reconnection 0.00 100.00 100.00 60.00 39.00     99.00 1.00
G Refund of amount due in regard to temporary connection 8.00 18.00 26.00 16.00 10.00     26.00 0.00
H Others 8.00 124.00 132.00 80.00 52.00     132.00 0.00
AMR A(i) Loose connections from pole 0.00 874.00 874.00 383.00 491.00     874.00 0.00
A(ii) Interruption due to line breakdown 0.00 737.00 737.00 267.00 470.00     737.00 0.00
A(iii) Interruption due to failure of transformer 18.00 792.00 810.00 484.00 326.00     810.00 0.00
B(i) Ordinary case, which requires no augmentation. 0.00 124.00 124.00 48.00 66.00     114.00 10.00
B(ii) Where augmentation is required. 0.00 57.00 57.00 15.00 42.00     57.00 0.00
C(i) Stopped/Defective Meters 0.00 830.00 830.00 303.00 501.00     804.00 26.00
C(ii) Billing on average basis for more than two bills 0.00 409.00 409.00 152.00 257.00     409.00 0.00
D(i) Loose Wires 0.00 791.00 791.00 342.00 449.00     791.00 0.00
D(ii) Inadequate ground clearance 0.00 315.00 315.00 131.00 184.00     315.00 0.00
E(i) For current bills where no additional information is required 0.00 441.00 441.00 240.00 201.00     441.00 0.00
E(ii) Where additional information relating to correctness of reading etc. is required 0.00 228.00 228.00 81.00 147.00     228.00 0.00
F(i) Where extension of mains is not required 0.00 146.00 146.00 51.00 95.00     146.00 0.00
F(ii) Where extension of mains is required 0.00 112.00 112.00 57.00 55.00     112.00 0.00
F(iii) Modification in connected load 10.00 263.00 273.00 151.00 122.00     273.00 0.00
F(iv) Name change/reconnection 7.00 381.00 388.00 145.00 243.00     388.00 0.00
G Refund of amount due in regard to temporary connection 0.00 44.00 44.00 11.00 33.00     44.00 0.00
H Others 2.00 174.00 176.00 74.00 102.00     176.00 0.00
SNR A(i) Loose connections from pole 0.00 760.00 760.00 729.00 31.00     760.00 0.00
A(ii) Interruption due to line breakdown 0.00 178.00 178.00 160.00 18.00     178.00 0.00
A(iii) Interruption due to failure of transformer 0.00 140.00 140.00 132.00 8.00     140.00 0.00
B(i) Ordinary case, which requires no augmentation. 0.00 0.00 0.00 0.00 0.00     0.00 0.00
B(ii) Where augmentation is required. 0.00 4.00 4.00 4.00 0.00     4.00 0.00
C(i) Stopped/Defective Meters 2.00 300.00 302.00 276.00 26.00     302.00 0.00
C(ii) Billing on average basis for more than two bills 3.00 60.00 63.00 55.00 8.00     63.00 0.00
D(i) Loose Wires 0.00 40.00 40.00 38.00 2.00     40.00 0.00
D(ii) Inadequate ground clearance 1.00 10.00 11.00 10.00 1.00     11.00 0.00
E(i) For current bills where no additional information is required 0.00 30.00 30.00 27.00 3.00     30.00 0.00
E(ii) Where additional information relating to correctness of reading etc. is required 0.00 19.00 19.00 17.00 2.00     19.00 0.00
F(i) Where extension of mains is not required 1.00 22.00 23.00 21.00 2.00     23.00 0.00
F(ii) Where extension of mains is required 0.00 25.00 25.00 25.00 0.00     25.00 0.00
F(iii) Modification in connected load 0.00 18.00 18.00 15.00 3.00     18.00 0.00
F(iv) Name change/reconnection 0.00 110.00 110.00 109.00 1.00     110.00 0.00
G Refund of amount due in regard to temporary connection 0.00 26.00 26.00 23.00 3.00     26.00 0.00
H Others 5.00 16.00 21.00 16.00 5.00     21.00 0.00
PGVCL A(i) Loose connections from pole 36.00 77965.00 78001.00 44449.65 33078.35 415.00 58.00 78001.00 0.00
A(ii) Interruption due to line breakdown 9.00 28741.00 28750.00 12957.00 15669.00 108.00 16.00 28750.00 0.00
A(iii) Interruption due to failure of transformer 18.00 10010.00 10028.00 4003.00 6004.00 21.00 0.00 10028.00 0.00
B(i) Ordinary case, which requires no augmentation. 15.00 1095.00 1110.00 361.00 728.00 2.00 0.00 1091.00 19.00
B(ii) Where augmentation is required. 3.00 828.00 831.00 234.00 597.00 0.00 0.00 831.00 0.00
C(i) Stopped/Defective Meters 16.00 13159.00 13175.00 6249.00 6842.00 52.00 0.00 13143.00 32.00
C(ii) Billing on average basis for more than two bills 40.00 5105.00 5145.00 2479.00 2646.00 10.00 0.00 5135.00 10.00
D(i) Loose Wires 6.00 9934.00 9940.00 3946.00 5986.00 6.00 0.00 9938.00 2.00
D(ii) Inadequate ground clearance 2.00 1551.00 1553.00 564.00 978.00 11.00 0.00 1553.00 0.00
E(i) For current bills where no additional information is required 12.00 3238.00 3250.00 1455.00 1790.00 0.00 0.00 3245.00 5.00
E(ii) Where additional information relating to correctness of reading etc. is required 8.00 5101.00 5109.00 2535.00 2556.00 0.00 0.00 5091.00 18.00
F(i) Where extension of mains is not required 6.00 2163.00 2169.00 1027.75 1136.25 0.00 0.00 2164.00 5.00
F(ii) Where extension of mains is required 7.00 1936.00 1943.00 770.20 1159.80 13.00 0.00 1943.00 0.00
F(iii) Modification in connected load 14.00 3029.00 3043.00 1049.95 1986.05 3.00 0.00 3039.00 4.00
F(iv) Name change/reconnection 71.00 10757.00 10828.00 5487.60 5281.40 0.00 0.00 10769.00 59.00
G Refund of amount due in regard to temporary connection 26.00 1029.00 1055.00 338.40 693.60 1.00 0.00 1033.00 22.00
H Others 69.00 4011.00 4080.00 1809.00 2251.00 0.00 0.00 4060.00 20.00