Performa SoP 015: Release of New Connection status
Name of Area/Circle Consumer category Total no. of consumers connected at the beginning of half-year/year Pending at the Beginning of the of the Half year/year New Applications received during the half-year / year No. of connections released  during the half-year / year No. of applications pending at the end of half-year / year[1] Total no. of consumers connected at the end of half-year/year 7593 Actual / Master
1st Half RGP 3531021 6421 47433 48029 5825 3579050 1707542 1871508 3579050 0 5825
GLP 29240 66 536 534 68 29774 29774 0 68
N-RGP & LTMD 644665 2397 10431 9990 2838 654655 544352 90383 1971 17949 654655 0 2838
Public Water Works 17050 79 170 178 71 17228 426 2771 12507 1524 17228 0 71
Agriculture (Total) unmetered 258457     -121   258336 258336 0 121
metered 588953 13624 55822 51637 17809 640590 606516 28672 24 5378 640590 0 17809
public lighting 7619 55 202 186 71 7805 7115 690 7805 0 71
Industrial HT 5172 69 218 219 68 5391 5391 68 0
Railway 0 0 0 0 0 0 0
Total 5082177 22711 114812 110652 26750 5192829
2nd Half RGP 3579050 5825        
GLP 29774 68        
N-RGP & LTMD 654655 2838        
Public Water Works 17228 71        
Agriculture (Total) unmetered 258336          
metered 640590 17809        
public lighting 7805 71        
Industrial HT 5391 68        
Railway 0 0        
Total 5192829 26750        
Annual RGP            
GLP            
N-RGP & LTMD            
Public Water Works            
Agriculture (Total) unmetered            
metered            
public lighting            
Industrial HT            
Railway            
Total            

[1]
Mr. J Shingala:
Surveyed+UnSurveyed + Paid Pending