Performa SoP 003 B: APPENDIX-B (already in the SoP regulation)
REGISTER FOR COMPILING THE COMPLAINTS CLASSIFICATIONWISE
Name of Area / Circle Classification Pending complaints of previous Qtr Complaints received during the Qtr Total Complaints No. of Complaints redressed during the Qtr Balance Complaints to be redressed
(5) – (10)
In stipulated time Beyond stipulated time Total (6) to (9)
Within 50% of stipulated time. Within stipulated time. Up to double the stipulated time More than double the stipulated time
1 2   3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00 11.00
RJC A(i) Loose connections from pole 9.00 11246.00 11255.00 6523.00 4723.00 0.00 0.00 11246.00 9.00
A(ii) Interruption due to line breakdown 2.00 2484.00 2486.00 504.00 1980.00 0.00 0.00 2484.00 2.00
A(iii) Interruption due to failure of transformer 0.00 193.00 193.00 55.00 138.00 0.00 0.00 193.00 0.00
B(i) Ordinary case, which requires no augmentation. 6.00 39.00 45.00 14.00 25.00 0.00 0.00 39.00 6.00
B(ii) Where augmentation is required. 4.00 39.00 43.00 19.00 20.00 0.00 0.00 39.00 4.00
C(i) Stopped/Defective Meters 2.00 1442.00 1444.00 504.00 938.00 0.00 0.00 1442.00 2.00
C(ii) Billing on average basis for more than two bills 13.00 429.00 442.00 102.00 327.00 0.00 0.00 429.00 13.00
D(i) Loose Wires 0.00 318.00 318.00 187.00 131.00 0.00 0.00 318.00 0.00
D(ii) Inadequate ground clearance 0.00 12.00 12.00 0.00 12.00 0.00 0.00 12.00 0.00
E(i) For current bills where no additional information is required 15.00 207.00 222.00 41.00 166.00 0.00 0.00 207.00 15.00
E(ii) Where additional information relating to correctness of reading etc. is required 26.00 333.00 359.00 87.00 246.00 0.00 0.00 333.00 26.00
F(i) Where extension of mains is not required 4.00 283.00 287.00 45.00 238.00 0.00 0.00 283.00 4.00
F(ii) Where extension of mains is required 0.00 172.00 172.00 23.00 145.00 0.00 0.00 168.00 4.00
F(iii) Modification in connected load 2.00 408.00 410.00 117.00 291.00 0.00 0.00 408.00 2.00
F(iv) Name change/reconnection 44.00 3488.00 3532.00 1828.00 1660.00 0.00 0.00 3488.00 44.00
G Refund of amount due in regard to temporary connection 20.00 179.00 199.00 59.00 118.00 0.00 0.00 177.00 22.00
H Others 7.00 55.00 62.00 5.00 50.00 0.00 0.00 55.00 7.00
RJR A(i) Loose connections from pole 2.00 3887.00 3889.00 2511.00 1378.00     3889.00 0.00
A(ii) Interruption due to line breakdown 1.00 1751.00 1752.00 1137.00 615.00     1752.00 0.00
A(iii) Interruption due to failure of transformer 5.00 494.00 499.00 322.00 177.00     499.00 0.00
B(i) Ordinary case, which requires no augmentation. 0.00 124.00 124.00 68.00 56.00     124.00 0.00
B(ii) Where augmentation is required. 0.00 154.00 154.00 79.00 75.00     154.00 0.00
C(i) Stopped/Defective Meters 4.00 1514.00 1518.00 1268.00 250.00     1518.00 0.00
C(ii) Billing on average basis for more than two bills 2.00 517.00 519.00 368.00 151.00     519.00 0.00
D(i) Loose Wires 2.00 118.00 120.00 91.00 29.00     120.00 0.00
D(ii) Inadequate ground clearance 1.00 6.00 7.00 4.00 2.00     6.00 1.00
E(i) For current bills where no additional information is required 0.00 708.00 708.00 692.00 16.00     708.00 0.00
E(ii) Where additional information relating to correctness of reading etc. is required 5.00 1069.00 1074.00 1059.00 15.00     1074.00 0.00
F(i) Where extension of mains is not required 0.00 16.00 16.00 13.00 3.00     16.00 0.00
F(ii) Where extension of mains is required 0.00 54.00 54.00 32.00 22.00     54.00 0.00
F(iii) Modification in connected load 0.00 186.00 186.00 131.00 55.00     186.00 0.00
F(iv) Name change/reconnection 3.00 496.00 499.00 276.00 223.00     499.00 0.00
G Refund of amount due in regard to temporary connection 0.00 336.00 336.00 182.00 154.00     336.00 0.00
H Others 7.00 1693.00 1700.00 1221.00 476.00     1697.00 3.00
MRB A(i) Loose connections from pole 6.00 3001.00 3007.00 2032.00 969.00     3001.00 6.00
A(ii) Interruption due to line breakdown 1.00 5563.00 5564.00 2237.00 3326.00     5563.00 1.00
A(iii) Interruption due to failure of transformer 1.00 352.00 353.00 194.00 158.00     352.00 1.00
B(i) Ordinary case, which requires no augmentation. 3.00 16.00 19.00 7.00 9.00     16.00 3.00
B(ii) Where augmentation is required. 3.00 30.00 33.00 12.00 18.00     30.00 3.00
C(i) Stopped/Defective Meters 3.00 1582.00 1585.00 520.00 1062.00     1582.00 3.00
C(ii) Billing on average basis for more than two bills 2.00 183.00 185.00 95.00 88.00     183.00 2.00
D(i) Loose Wires 0.00 475.00 475.00 171.00 304.00     475.00 0.00
D(ii) Inadequate ground clearance 0.00 2.00 2.00 1.00 1.00     2.00 0.00
E(i) For current bills where no additional information is required 4.00 561.00 565.00 321.00 240.00     561.00 4.00
E(ii) Where additional information relating to correctness of reading etc. is required 2.00 302.00 304.00 155.00 147.00     302.00 2.00
F(i) Where extension of mains is not required 7.00 46.00 53.00 25.00 21.00     46.00 7.00
F(ii) Where extension of mains is required 4.00 99.00 103.00 34.00 65.00     99.00 4.00
F(iii) Modification in connected load 3.00 95.00 98.00 42.00 53.00     95.00 3.00
F(iv) Name change/reconnection 4.00 452.00 456.00 164.00 288.00     452.00 4.00
G Refund of amount due in regard to temporary connection 0.00 6.00 6.00 2.00 4.00     6.00 0.00
H Others 3.00 888.00 891.00 350.00 538.00     888.00 3.00
PBR A(i) Loose connections from pole 1.00 1129.00 1130.00 347.00 782.00     1129.00 1.00
A(ii) Interruption due to line breakdown 2.00 907.00 909.00 479.00 428.00     907.00 2.00
A(iii) Interruption due to failure of transformer 0.00 247.00 247.00 176.00 71.00     247.00 0.00
B(i) Ordinary case, which requires no augmentation. 0.00 37.00 37.00 28.00 9.00     37.00 0.00
B(ii) Where augmentation is required. 1.00 19.00 20.00 12.00 7.00     19.00 1.00
C(i) Stopped/Defective Meters 1.00 386.00 387.00 217.00 169.00     386.00 1.00
C(ii) Billing on average basis for more than two bills 3.00 542.00 545.00 289.00 253.00     542.00 3.00
D(i) Loose Wires 3.00 967.00 970.00 337.00 630.00     967.00 3.00
D(ii) Inadequate ground clearance 4.00 234.00 238.00 174.00 60.00     234.00 4.00
E(i) For current bills where no additional information is required 0.00 614.00 614.00 369.00 245.00     614.00 0.00
E(ii) Where additional information relating to correctness of reading etc. is required 2.00 642.00 644.00 462.00 180.00     642.00 2.00
F(i) Where extension of mains is not required 2.00 438.00 440.00 317.00 121.00     438.00 2.00
F(ii) Where extension of mains is required 0.00 342.00 342.00 286.00 56.00     342.00 0.00
F(iii) Modification in connected load 2.00 143.00 145.00 184.00 -41.00     143.00 2.00
F(iv) Name change/reconnection 0.00 127.00 127.00 24.00 103.00     127.00 0.00
G Refund of amount due in regard to temporary connection 0.00 14.00 14.00 12.00 2.00     14.00 0.00
H Others 1.00 483.00 484.00 157.00 326.00     483.00 1.00
JMN A(i) Loose connections from pole 2.00 1110.00 1112.00 129.00 981.00 0.00 0.00 1110.00 2.00
A(ii) Interruption due to line breakdown 3.00 3910.00 3913.00 48.00 3862.00 0.00 0.00 3910.00 3.00
A(iii) Interruption due to failure of transformer 1.00 935.00 936.00 32.00 903.00 0.00 0.00 935.00 1.00
B(i) Ordinary case, which requires no augmentation. 0.00 105.00 105.00 0.00 105.00 0.00 0.00 105.00 0.00
B(ii) Where augmentation is required. 0.00 82.00 82.00 0.00 82.00 0.00 0.00 82.00 0.00
C(i) Stopped/Defective Meters 0.00 444.00 444.00 24.00 420.00 0.00 0.00 444.00 0.00
C(ii) Billing on average basis for more than two bills 8.00 410.00 418.00 19.00 391.00 0.00 0.00 410.00 8.00
D(i) Loose Wires 2.00 661.00 663.00 31.00 630.00 0.00 0.00 661.00 2.00
D(ii) Inadequate ground clearance 0.00 185.00 185.00 0.00 185.00 0.00 0.00 185.00 0.00
E(i) For current bills where no additional information is required 0.00 395.00 395.00 0.00 395.00 0.00 0.00 395.00 0.00
E(ii) Where additional information relating to correctness of reading etc. is required 9.00 212.00 221.00 21.00 191.00 0.00 0.00 212.00 9.00
F(i) Where extension of mains is not required 0.00 385.00 385.00 0.00 385.00 0.00 0.00 385.00 0.00
F(ii) Where extension of mains is required 0.00 105.00 105.00 0.00 105.00 0.00 0.00 105.00 0.00
F(iii) Modification in connected load 4.00 402.00 406.00 3.00 399.00 0.00 0.00 402.00 4.00
F(iv) Name change/reconnection 1.00 204.00 205.00 197.00 7.00 0.00 0.00 204.00 1.00
G Refund of amount due in regard to temporary connection 10.00 97.00 107.00 34.00 63.00 0.00 0.00 97.00 10.00
H Others 7.00 738.00 745.00 7.00 731.00 0.00 0.00 738.00 7.00 OLD BHUJ NEW BHUJ NEW ANJAR
BHJ A(i) Loose connections from pole 10.00 3282.00 3292.00 1978.00 1310.00     3288.00 4.00 11 4.4 6.6
A(ii) Interruption due to line breakdown 5.00 1563.00 1568.00 939.00 625.00     1564.00 4.00 0 0 0
A(iii) Interruption due to failure of transformer 0.00 793.00 793.00 471.00 317.00     788.00 5.00 0 0 0
B(i) Ordinary case, which requires no augmentation. 7.00 254.00 261.00 156.00 101.00     257.00 4.00 6 2.4 3.6
B(ii) Where augmentation is required. 6.00 330.00 336.00 204.00 132.00     336.00 0.00 9 3.6 5.4
C(i) Stopped/Defective Meters 3.00 385.00 388.00 232.00 154.00     386.00 2.00 10 4 6
C(ii) Billing on average basis for more than two bills 4.00 295.00 299.00 178.00 118.00     296.00 3.00 27 10.8 16.2
D(i) Loose Wires 1.00 776.00 777.00 466.00 310.00     776.00 1.00 0 0 0
D(ii) Inadequate ground clearance 3.00 164.00 167.00 100.00 64.00     164.00 3.00 4 1.6 2.4
E(i) For current bills where no additional information is required 5.00 369.00 374.00 221.00 149.00     370.00 4.00 0 0 0
E(ii) Where additional information relating to correctness of reading etc. is required 2.00 358.00 360.00 214.00 144.00     358.00 2.00 32 12.8 19.2
F(i) Where extension of mains is not required 1.00 30.00 31.00 19.00 12.00     31.00 0.00 0 0 0
F(ii) Where extension of mains is required 0.00 0.00 0.00 0.00 0.00     0.00 0.00 0 0 0
F(iii) Modification in connected load 0.00 405.00 405.00 243.00 162.00     405.00 0.00 0 0 0
F(iv) Name change/reconnection 6.00 662.00 668.00 396.00 266.00     662.00 6.00 0 0 0
G Refund of amount due in regard to temporary connection 5.00 227.00 232.00 137.00 90.00     227.00 5.00 5 2 3
H Others 3.00 240.00 243.00 144.00 96.00     240.00 3.00 0 0 0
ANJAR A(i) Loose connections from pole 0.00 1613.00 1613.00 682.00 931.00 0.00 0.00 1613.00 0.00
A(ii) Interruption due to line breakdown 3.00 330.00 333.00 171.00 162.00 0.00 0.00 333.00 0.00
A(iii) Interruption due to failure of transformer 3.00 220.00 223.00 91.00 132.00 0.00 0.00 223.00 0.00
B(i) Ordinary case, which requires no augmentation. 0.00 2.00 2.00 1.00 1.00 0.00 0.00 2.00 0.00
B(ii) Where augmentation is required. 1.00 17.00 18.00 14.00 4.00 0.00 0.00 18.00 0.00
C(i) Stopped/Defective Meters 6.00 331.00 337.00 160.00 177.00 0.00 0.00 337.00 0.00
C(ii) Billing on average basis for more than two bills 8.00 197.00 205.00 112.00 93.00 0.00 0.00 205.00 0.00
D(i) Loose Wires 5.00 533.00 538.00 307.00 231.00 0.00 0.00 538.00 0.00
D(ii) Inadequate ground clearance 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
E(i) For current bills where no additional information is required 2.00 44.00 46.00 29.00 17.00 0.00 0.00 46.00 0.00
E(ii) Where additional information relating to correctness of reading etc. is required 11.00 268.00 279.00 173.00 106.00 0.00 0.00 279.00 0.00
F(i) Where extension of mains is not required 5.00 4.00 9.00 7.00 2.00 0.00 0.00 9.00 0.00
F(ii) Where extension of mains is required 1.00 0.00 1.00 1.00 0.00 0.00 0.00 1.00 0.00
F(iii) Modification in connected load 4.00 174.00 178.00 60.00 118.00 0.00 0.00 178.00 0.00
F(iv) Name change/reconnection 1.00 235.00 236.00 117.00 119.00 0.00 0.00 236.00 0.00
G Refund of amount due in regard to temporary connection 0.00 10.00 10.00 5.00 5.00 0.00 0.00 10.00 0.00
H Others 2.00 186.00 188.00 93.00 95.00 0.00 0.00 188.00 0.00
JND A(i) Loose connections from pole 8.00 10542.00 10550.00 7480.00 3069.00 1.00 0.00 10550.00 0.00
A(ii) Interruption due to line breakdown 3.00 3981.00 3984.00 2553.00 1423.00 7.00 1.00 3984.00 0.00
A(iii) Interruption due to failure of transformer 3.00 1103.00 1106.00 628.00 476.00 2.00 0.00 1106.00 0.00
B(i) Ordinary case, which requires no augmentation. 2.00 51.00 53.00 39.00 14.00 0.00 0.00 53.00 0.00
B(ii) Where augmentation is required. 2.00 21.00 23.00 15.00 8.00 0.00 0.00 23.00 0.00
C(i) Stopped/Defective Meters 0.00 750.00 750.00 433.00 317.00 0.00 0.00 750.00 0.00
C(ii) Billing on average basis for more than two bills 0.00 85.00 85.00 50.00 35.00 0.00 0.00 85.00 0.00
D(i) Loose Wires 5.00 687.00 692.00 441.00 249.00 2.00 0.00 692.00 0.00
D(ii) Inadequate ground clearance 3.00 147.00 150.00 76.00 73.00 1.00 0.00 150.00 0.00
E(i) For current bills where no additional information is required 5.00 46.00 51.00 32.00 19.00 0.00 0.00 51.00 0.00
E(ii) Where additional information relating to correctness of reading etc. is required 3.00 55.00 58.00 43.00 15.00 0.00 0.00 58.00 0.00
F(i) Where extension of mains is not required 0.00 30.00 30.00 23.00 7.00 0.00 0.00 30.00 0.00
F(ii) Where extension of mains is required 0.00 16.00 16.00 7.00 9.00 0.00 0.00 16.00 0.00
F(iii) Modification in connected load 4.00 202.00 206.00 103.00 103.00 0.00 0.00 206.00 0.00
F(iv) Name change/reconnection 2.00 140.00 142.00 96.00 46.00 0.00 0.00 142.00 0.00
G Refund of amount due in regard to temporary connection 1.00 52.00 53.00 20.00 33.00 0.00 0.00 53.00 0.00
H Others 6.00 300.00 306.00 156.00 150.00 0.00 0.00 306.00 0.00
BVN A(i) Loose connections from pole 4.00 13542.00 13546.00 9429.00 4112.00 0.00 0.00 13541.00 5.00
A(ii) Interruption due to line breakdown 2.00 2361.00 2363.00 1602.00 759.00 0.00 0.00 2361.00 2.00
A(iii) Interruption due to failure of transformer 7.00 888.00 895.00 589.00 298.00 0.00 0.00 887.00 8.00
B(i) Ordinary case, which requires no augmentation. 6.00 39.00 45.00 26.00 13.00 0.00 0.00 39.00 6.00
B(ii) Where augmentation is required. 7.00 58.00 65.00 47.00 11.00 0.00 0.00 58.00 7.00
C(i) Stopped/Defective Meters 9.00 1870.00 1879.00 1284.00 585.00 0.00 0.00 1869.00 10.00
C(ii) Billing on average basis for more than two bills 1.00 786.00 787.00 571.00 215.00 0.00 0.00 786.00 1.00
D(i) Loose Wires 8.00 388.00 396.00 288.00 100.00 0.00 0.00 388.00 8.00
D(ii) Inadequate ground clearance 10.00 120.00 130.00 100.00 20.00 0.00 0.00 120.00 10.00
E(i) For current bills where no additional information is required 7.00 285.00 292.00 230.00 55.00 0.00 0.00 285.00 7.00
E(ii) Where additional information relating to correctness of reading etc. is required 0.00 681.00 681.00 468.00 213.00 0.00 0.00 681.00 0.00
F(i) Where extension of mains is not required 10.00 640.00 650.00 533.00 106.00 0.00 0.00 639.00 11.00
F(ii) Where extension of mains is required 5.00 164.00 169.00 128.00 36.00 0.00 0.00 164.00 5.00
F(iii) Modification in connected load 6.00 284.00 290.00 222.00 61.00 0.00 0.00 283.00 7.00
F(iv) Name change/reconnection 13.00 3018.00 3031.00 2384.00 633.00 0.00 0.00 3017.00 14.00
G Refund of amount due in regard to temporary connection 21.00 125.00 146.00 77.00 47.00 0.00 0.00 124.00 22.00
H Others 80.00 169.00 249.00 127.00 42.00 0.00 0.00 169.00 80.00
BTD A(i) Loose connections from pole 7.00 1632.00 1639.00 1319.00 313.00 0.00 0.00 1632.00 7.00
A(ii) Interruption due to line breakdown 2.00 526.00 528.00 514.00 12.00 0.00 0.00 526.00 2.00
A(iii) Interruption due to failure of transformer 2.00 411.00 413.00 385.00 26.00 0.00 0.00 411.00 2.00
B(i) Ordinary case, which requires no augmentation. 0.00 104.00 104.00 95.00 9.00 0.00 0.00 104.00 0.00
B(ii) Where augmentation is required. 2.00 46.00 48.00 46.00 0.00 0.00 0.00 46.00 2.00
C(i) Stopped/Defective Meters 1.00 450.00 451.00 304.00 146.00 0.00 0.00 450.00 1.00
C(ii) Billing on average basis for more than two bills 5.00 111.00 116.00 104.00 7.00 0.00 0.00 111.00 5.00
D(i) Loose Wires 4.00 93.00 97.00 91.00 2.00 0.00 0.00 93.00 4.00
D(ii) Inadequate ground clearance 2.00 7.00 9.00 7.00 0.00 0.00 0.00 7.00 2.00
E(i) For current bills where no additional information is required 1.00 76.00 77.00 62.00 14.00 0.00 0.00 76.00 1.00
E(ii) Where additional information relating to correctness of reading etc. is required 1.00 43.00 44.00 43.00 0.00 0.00 0.00 43.00 1.00
F(i) Where extension of mains is not required 0.00 5.00 5.00 5.00 0.00 0.00 0.00 5.00 0.00
F(ii) Where extension of mains is required 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
F(iii) Modification in connected load 5.00 95.00 100.00 74.00 21.00 0.00 0.00 95.00 5.00
F(iv) Name change/reconnection 2.00 173.00 175.00 116.00 57.00 0.00 0.00 173.00 2.00
G Refund of amount due in regard to temporary connection 0.00 12.00 12.00 11.00 1.00 0.00 0.00 12.00 0.00
H Others 6.00 19.00 25.00 13.00 6.00 0.00 0.00 19.00 6.00
AMR A(i) Loose connections from pole 29.00 4555.00 4584.00 628.00 3763.00 193.00 0.00 4584.00 0.00
A(ii) Interruption due to line breakdown 34.00 1708.00 1742.00 305.00 1156.00 281.00 0.00 1742.00 0.00
A(iii) Interruption due to failure of transformer 17.00 3484.00 3501.00 615.00 2353.00 526.00 0.00 3494.00 7.00
B(i) Ordinary case, which requires no augmentation. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
B(ii) Where augmentation is required. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
C(i) Stopped/Defective Meters 40.00 684.00 724.00 160.00 431.00 99.00 0.00 690.00 34.00
C(ii) Billing on average basis for more than two bills 7.00 689.00 696.00 447.00 236.00 0.00 0.00 683.00 13.00
D(i) Loose Wires 48.00 230.00 278.00 50.00 120.00 54.00 0.00 224.00 54.00
D(ii) Inadequate ground clearance 2.00 119.00 121.00 32.00 68.00 21.00 0.00 121.00 0.00
E(i) For current bills where no additional information is required 0.00 388.00 388.00 144.00 244.00 0.00 0.00 388.00 0.00
E(ii) Where additional information relating to correctness of reading etc. is required 4.00 235.00 239.00 79.00 160.00 0.00 0.00 239.00 0.00
F(i) Where extension of mains is not required 4.00 379.00 383.00 140.00 219.00 24.00 0.00 383.00 0.00
F(ii) Where extension of mains is required 4.00 415.00 419.00 101.00 246.00 72.00 0.00 419.00 0.00
F(iii) Modification in connected load 98.00 890.00 988.00 191.00 584.00 135.00 0.00 910.00 78.00
F(iv) Name change/reconnection 3.00 539.00 542.00 199.00 332.00 0.00 0.00 531.00 11.00
G Refund of amount due in regard to temporary connection 15.00 101.00 116.00 23.00 78.00 9.00 0.00 110.00 6.00
H Others 23.00 132.00 155.00 33.00 88.00 17.00 0.00 138.00 17.00
SNR A(i) Loose connections from pole 2.00 977.00 979.00 369.00 608.00 0.00 0.00 977.00 2.00
A(ii) Interruption due to line breakdown 2.00 995.00 997.00 213.00 782.00 0.00 0.00 995.00 2.00
A(iii) Interruption due to failure of transformer 4.00 768.00 772.00 250.00 519.00 0.00 0.00 769.00 3.00
B(i) Ordinary case, which requires no augmentation. 3.00 72.00 75.00 17.00 56.00 0.00 0.00 73.00 2.00
B(ii) Where augmentation is required. 0.00 65.00 65.00 14.00 50.00 0.00 0.00 64.00 1.00
C(i) Stopped/Defective Meters 3.00 348.00 351.00 108.00 241.00 0.00 0.00 349.00 2.00
C(ii) Billing on average basis for more than two bills 3.00 362.00 365.00 111.00 253.00 0.00 0.00 364.00 1.00
D(i) Loose Wires 1.00 590.00 591.00 113.00 474.00 0.00 0.00 587.00 4.00
D(ii) Inadequate ground clearance 0.00 181.00 181.00 42.00 137.00 0.00 0.00 179.00 2.00
E(i) For current bills where no additional information is required 7.00 271.00 278.00 69.00 201.00 0.00 0.00 270.00 8.00
E(ii) Where additional information relating to correctness of reading etc. is required 2.00 205.00 207.00 54.00 152.00 0.00 0.00 206.00 1.00
F(i) Where extension of mains is not required 2.00 365.00 367.00 79.00 286.00 0.00 0.00 365.00 2.00
F(ii) Where extension of mains is required 0.00 102.00 102.00 22.00 77.00 0.00 0.00 99.00 3.00
F(iii) Modification in connected load 4.00 362.00 366.00 106.00 256.00 0.00 0.00 362.00 4.00
F(iv) Name change/reconnection 6.00 56.00 62.00 8.00 52.00 0.00 0.00 60.00 2.00
G Refund of amount due in regard to temporary connection 4.00 92.00 96.00 14.00 78.00 0.00 0.00 92.00 4.00
H Others 5.00 655.00 660.00 119.00 536.00 0.00 0.00 655.00 5.00
PGVCL A(i) Loose connections from pole 80.00 54903.00 54983.00 32745.00 22008.00 194.00 0.00 54947.00 36.00
A(ii) Interruption due to line breakdown 57.00 25749.00 25806.00 10531.00 14968.00 288.00 1.00 25788.00 18.00
A(iii) Interruption due to failure of transformer 40.00 9668.00 9708.00 3717.00 5436.00 528.00 0.00 9681.00 27.00
B(i) Ordinary case, which requires no augmentation. 27.00 841.00 868.00 450.00 397.00 0.00 0.00 847.00 21.00
B(ii) Where augmentation is required. 25.00 844.00 869.00 448.00 403.00 0.00 0.00 851.00 18.00
C(i) Stopped/Defective Meters 66.00 9855.00 9921.00 5054.00 4713.00 99.00 0.00 9866.00 55.00
C(ii) Billing on average basis for more than two bills 48.00 4409.00 4457.00 2334.00 2074.00 0.00 0.00 4408.00 49.00
D(i) Loose Wires 74.00 5303.00 5377.00 2266.00 2979.00 56.00 0.00 5301.00 76.00
D(ii) Inadequate ground clearance 25.00 1177.00 1202.00 536.00 622.00 22.00 0.00 1180.00 22.00
E(i) For current bills where no additional information is required 44.00 3920.00 3964.00 2181.00 1744.00 0.00 0.00 3925.00 39.00
E(ii) Where additional information relating to correctness of reading etc. is required 56.00 4135.00 4191.00 2685.00 1463.00 0.00 0.00 4148.00 43.00
F(i) Where extension of mains is not required 30.00 2617.00 2647.00 1199.00 1398.00 24.00 0.00 2621.00 26.00
F(ii) Where extension of mains is required 13.00 1469.00 1482.00 633.00 761.00 72.00 0.00 1466.00 16.00
F(iii) Modification in connected load 128.00 3472.00 3600.00 1416.00 1944.00 135.00 0.00 3495.00 105.00
F(iv) Name change/reconnection 84.00 9355.00 9439.00 5688.00 3667.00 0.00 0.00 9355.00 84.00
G Refund of amount due in regard to temporary connection 76.00 1241.00 1317.00 571.00 668.00 9.00 0.00 1248.00 69.00
H Others 148.00 5372.00 5520.00 2332.00 3039.00 17.00 0.00 5388.00 132.00
1021.00 144330.00 145351.00 74786.00 68284.00 1444.00 1.00 144515.00 836.00
RED MARK SHOULD BE GREATER THAN 0. BLANK AUTO BLANK AUTO PUT IN FIRST COLUMN
      COLUMN - D IS NOT EQUAL TO COLUMN - L