Performa SoP 003 B: APPENDIX-B (already in the SoP regulation)
REGISTER FOR COMPILING THE COMPLAINTS CLASSIFICATIONWISE
Name of Area / Circle Classification Pending complaints of previous Qtr Complaints received during the Qtr Total Complaints No. of Complaints redressed during the Qtr Balance Complaints to be redressed
(5) – (10)
In stipulated time Beyond stipulated time Total (6) to (9)
Within 50% of stipulated time. Within stipulated time. Up to double the stipulated time More than double the stipulated time
1 2   3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00 11.00  
RJC A(i) Loose connections from pole 50.00 13116.00 13166.00 8106.00 5050.00 1.00 0.00 13157.00 9.00
A(ii) Interruption due to line breakdown 3.00 1992.00 1995.00 515.00 1476.00 1.00 0.00 1992.00 3.00
A(iii) Interruption due to failure of transformer 2.00 170.00 172.00 49.00 122.00 0.00 0.00 171.00 1.00
B(i) Ordinary case, which requires no augmentation. 3.00 57.00 60.00 45.00 9.00 0.00 0.00 54.00 6.00
B(ii) Where augmentation is required. 2.00 44.00 46.00 34.00 8.00 0.00 0.00 42.00 4.00
C(i) Stopped/Defective Meters 4.00 1511.00 1515.00 848.00 661.00 0.00 0.00 1509.00 6.00
C(ii) Billing on average basis for more than two bills 8.00 307.00 315.00 132.00 170.00 0.00 0.00 302.00 13.00
D(i) Loose Wires 1.00 485.00 486.00 210.00 275.00 0.00 0.00 485.00 1.00
D(ii) Inadequate ground clearance 0.00 1.00 1.00 0.00 1.00 0.00 0.00 1.00 0.00
E(i) For current bills where no additional information is required 10.00 132.00 142.00 87.00 40.00 0.00 0.00 127.00 15.00
E(ii) Where additional information relating to correctness of reading etc. is required 14.00 170.00 184.00 53.00 105.00 0.00 0.00 158.00 26.00
F(i) Where extension of mains is not required 2.00 238.00 240.00 64.00 172.00 0.00 0.00 236.00 4.00
F(ii) Where extension of mains is required 2.00 209.00 211.00 50.00 157.00 0.00 0.00 207.00 4.00
F(iii) Modification in connected load 4.00 272.00 276.00 158.00 109.00 0.00 0.00 267.00 9.00
F(iv) Name change/reconnection 47.00 1801.00 1848.00 1072.00 730.00 0.00 0.00 1802.00 46.00
G Refund of amount due in regard to temporary connection 20.00 102.00 122.00 66.00 32.00 4.00 0.00 102.00 20.00
H Others 6.00 23.00 29.00 7.00 15.00 0.00 0.00 22.00 7.00
RJR A(i) Loose connections from pole 2.00 11332.00 11334.00 4841.00 6491.00 0.00 0.00 11332.00 2.00
A(ii) Interruption due to line breakdown 1.00 10952.00 10953.00 5381.00 5571.00 0.00 0.00 10952.00 1.00
A(iii) Interruption due to failure of transformer 1.00 4270.00 4271.00 1380.00 2890.00 0.00 0.00 4270.00 1.00
B(i) Ordinary case, which requires no augmentation. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
B(ii) Where augmentation is required. 0.00 733.00 733.00 322.00 411.00 0.00 0.00 733.00 0.00
C(i) Stopped/Defective Meters 4.00 991.00 995.00 991.00 0.00 0.00 0.00 991.00 4.00
C(ii) Billing on average basis for more than two bills 0.00 200.00 200.00 200.00 0.00 0.00 0.00 200.00 0.00
D(i) Loose Wires 1.00 1304.00 1305.00 684.00 620.00 0.00 0.00 1304.00 1.00
D(ii) Inadequate ground clearance 1.00 0.00 1.00 0.00 0.00 0.00 0.00 0.00 1.00
E(i) For current bills where no additional information is required 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
E(ii) Where additional information relating to correctness of reading etc. is required 9.00 145.00 154.00 149.00 0.00 0.00 0.00 149.00 5.00
F(i) Where extension of mains is not required 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
F(ii) Where extension of mains is required 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
F(iii) Modification in connected load 0.00 161.00 161.00 152.00 9.00 0.00 0.00 161.00 0.00
F(iv) Name change/reconnection 10.00 299.00 309.00 306.00 0.00 0.00 0.00 306.00 3.00
G Refund of amount due in regard to temporary connection 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
H Others 22.00 1600.00 1622.00 751.00 864.00 0.00 0.00 1615.00 7.00
MRB A(i) Loose connections from pole 6.00 6070.00 6076.00 4110.00 1960.00 0.00 0.00 6070.00 6.00
A(ii) Interruption due to line breakdown 1.00 11252.00 11253.00 4525.00 6727.00 0.00 0.00 11252.00 1.00
A(iii) Interruption due to failure of transformer 1.00 713.00 714.00 394.00 319.00 0.00 0.00 713.00 1.00
B(i) Ordinary case, which requires no augmentation. 3.00 31.00 34.00 13.00 18.00 0.00 0.00 31.00 3.00
B(ii) Where augmentation is required. 3.00 61.00 64.00 24.00 37.00 0.00 0.00 61.00 3.00
C(i) Stopped/Defective Meters 3.00 3200.00 3203.00 1052.00 2148.00 0.00 0.00 3200.00 3.00
C(ii) Billing on average basis for more than two bills 6.00 369.00 375.00 192.00 177.00 0.00 0.00 369.00 6.00
D(i) Loose Wires 2.00 961.00 963.00 346.00 615.00 0.00 0.00 961.00 2.00
D(ii) Inadequate ground clearance 0.00 4.00 4.00 3.00 1.00 0.00 0.00 4.00 0.00
E(i) For current bills where no additional information is required 4.00 1135.00 1139.00 649.00 486.00 0.00 0.00 1135.00 4.00
E(ii) Where additional information relating to correctness of reading etc. is required 5.00 610.00 615.00 312.00 298.00 0.00 0.00 610.00 5.00
F(i) Where extension of mains is not required 9.00 93.00 102.00 52.00 41.00 0.00 0.00 93.00 9.00
F(ii) Where extension of mains is required 4.00 201.00 205.00 70.00 131.00 0.00 0.00 201.00 4.00
F(iii) Modification in connected load 3.00 192.00 195.00 84.00 108.00 0.00 0.00 192.00 3.00
F(iv) Name change/reconnection 8.00 914.00 922.00 332.00 582.00 0.00 0.00 914.00 8.00
G Refund of amount due in regard to temporary connection 0.00 12.00 12.00 8.00 4.00 0.00 0.00 12.00 0.00
H Others 24.00 1796.00 1820.00 707.00 1107.00 0.00 0.00 1814.00 6.00
PBR A(i) Loose connections from pole 4.00 2168.00 2172.00 1045.00 1126.00 0.00 0.00 2171.00 1.00
A(ii) Interruption due to line breakdown 6.00 1874.00 1880.00 1406.00 469.00 0.00 0.00 1875.00 5.00
A(iii) Interruption due to failure of transformer 0.00 736.00 736.00 594.00 142.00 0.00 0.00 736.00 0.00
B(i) Ordinary case, which requires no augmentation. 0.00 47.00 47.00 35.00 12.00 0.00 0.00 47.00 0.00
B(ii) Where augmentation is required. 5.00 41.00 46.00 23.00 18.00 0.00 0.00 41.00 5.00
C(i) Stopped/Defective Meters 13.00 764.00 777.00 516.00 260.00 0.00 0.00 776.00 1.00
C(ii) Billing on average basis for more than two bills 10.00 927.00 937.00 562.00 370.00 0.00 0.00 932.00 5.00
D(i) Loose Wires 3.00 1566.00 1569.00 942.00 624.00 0.00 0.00 1566.00 3.00
D(ii) Inadequate ground clearance 4.00 424.00 428.00 340.00 84.00 0.00 0.00 424.00 4.00
E(i) For current bills where no additional information is required 4.00 985.00 989.00 754.00 235.00 0.00 0.00 989.00 0.00
E(ii) Where additional information relating to correctness of reading etc. is required 9.00 971.00 980.00 847.00 131.00 0.00 0.00 978.00 2.00
F(i) Where extension of mains is not required 4.00 612.00 616.00 455.00 159.00 0.00 0.00 614.00 2.00
F(ii) Where extension of mains is required 2.00 462.00 464.00 413.00 51.00 0.00 0.00 464.00 0.00
F(iii) Modification in connected load 2.00 472.00 474.00 318.00 154.00 0.00 0.00 472.00 2.00
F(iv) Name change/reconnection 0.00 429.00 429.00 347.00 82.00 0.00 0.00 429.00 0.00
G Refund of amount due in regard to temporary connection 0.00 17.00 17.00 17.00 0.00 0.00 0.00 17.00 0.00
H Others 8.00 2147.00 2155.00 1424.00 723.00 0.00 0.00 2147.00 8.00
JMN A(i) Loose connections from pole 2.00 201.00 203.00 160.00 41.00 0.00 0.00 201.00 2.00
A(ii) Interruption due to line breakdown 3.00 89.00 92.00 75.00 14.00 0.00 0.00 89.00 3.00
A(iii) Interruption due to failure of transformer 1.00 110.00 111.00 95.00 15.00 0.00 0.00 110.00 1.00
B(i) Ordinary case, which requires no augmentation. 0.00 0.00 0.00     0.00 0.00 0.00 0.00
B(ii) Where augmentation is required. 0.00 0.00 0.00     0.00 0.00 0.00 0.00
C(i) Stopped/Defective Meters 0.00 65.00 65.00 46.00 19.00 0.00 0.00 65.00 0.00
C(ii) Billing on average basis for more than two bills 8.00 32.00 40.00 24.00 8.00 0.00 0.00 32.00 8.00
D(i) Loose Wires 2.00 45.00 47.00 38.00 7.00 0.00 0.00 45.00 2.00
D(ii) Inadequate ground clearance 0.00   0.00     0.00 0.00 0.00 0.00
E(i) For current bills where no additional information is required 0.00 0.00 0.00     0.00 0.00 0.00 0.00
E(ii) Where additional information relating to correctness of reading etc. is required 14.00 30.00 44.00 29.00 1.00 0.00 0.00 30.00 14.00
F(i) Where extension of mains is not required 0.00   0.00     0.00 0.00 0.00 0.00
F(ii) Where extension of mains is required 0.00   0.00     0.00 0.00 0.00 0.00
F(iii) Modification in connected load 4.00 16.00 20.00 10.00 6.00 0.00 0.00 16.00 4.00
F(iv) Name change/reconnection 14.00 28.00 42.00 24.00 4.00 0.00 0.00 28.00 14.00
G Refund of amount due in regard to temporary connection 20.00 45.00 65.00 39.00 6.00 0.00 0.00 45.00 20.00
H Others 7.00   7.00     0.00 0.00 0.00 7.00 OLD BHUJ NEW BHUJ NEW ANJAR
BHJ A(i) Loose connections from pole 10.00 5187.00 5197.00 813.00 4374.00 0.00 0.00 5187.00 10.00 11 4 7
A(ii) Interruption due to line breakdown 4.00 2508.00 2512.00 596.00 1911.00 0.00 0.00 2507.00 5.00 0 0 0
A(iii) Interruption due to failure of transformer 11.00 1350.00 1361.00 249.00 1100.00 0.00 0.00 1349.00 12.00 0 0 0
B(i) Ordinary case, which requires no augmentation. 7.00 291.00 298.00 0.00 291.00 0.00 0.00 291.00 7.00 6 2 4
B(ii) Where augmentation is required. 5.00 552.00 557.00 52.00 499.00 0.00 0.00 551.00 6.00 9 4 5
C(i) Stopped/Defective Meters 12.00 851.00 863.00 246.00 604.00 0.00 0.00 850.00 13.00 10 4 6
C(ii) Billing on average basis for more than two bills 21.00 433.00 454.00 41.00 391.00 0.00 0.00 432.00 22.00 27 11 16
D(i) Loose Wires 10.00 1568.00 1578.00 464.00 1103.00 0.00 0.00 1567.00 11.00 0 0 0
D(ii) Inadequate ground clearance 5.00 251.00 256.00 47.00 206.00 0.00 0.00 253.00 3.00 4 2 2
E(i) For current bills where no additional information is required 5.00 263.00 268.00 25.00 238.00 0.00 0.00 263.00 5.00 0 0 0
E(ii) Where additional information relating to correctness of reading etc. is required 14.00 354.00 368.00 50.00 308.00 0.00 0.00 358.00 10.00 32 13 19
F(i) Where extension of mains is not required 1.00 0.00 1.00 0.00 0.00 0.00 0.00 0.00 1.00 0 0 0
F(ii) Where extension of mains is required 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 0 0
F(iii) Modification in connected load 4.00 279.00 283.00 45.00 238.00 0.00 0.00 283.00 0.00 0 0 0
F(iv) Name change/reconnection 6.00 870.00 876.00 51.00 819.00 0.00 0.00 870.00 6.00 0 0 0
G Refund of amount due in regard to temporary connection 9.00 193.00 202.00 42.00 152.00 0.00 0.00 194.00 8.00 5 2 3
H Others 3.00 89.00 92.00 0.00 89.00 0.00 0.00 89.00 3.00 0 0 0
ANJAR A(i) Loose connections from pole 4.00 1127.00 1131.00 420.00 707.00 0.00 0.00 1127.00 4.00
A(ii) Interruption due to line breakdown 3.00 972.00 975.00 282.00 690.00 0.00 0.00 972.00 3.00
A(iii) Interruption due to failure of transformer 3.00 341.00 344.00 213.00 128.00 0.00 0.00 341.00 3.00
B(i) Ordinary case, which requires no augmentation. 0.00 3.00 3.00 2.00 1.00 0.00 0.00 3.00 0.00
B(ii) Where augmentation is required. 1.00 224.00 225.00 51.00 173.00 0.00 0.00 224.00 1.00
C(i) Stopped/Defective Meters 12.00 387.00 399.00 120.00 267.00 0.00 0.00 387.00 12.00
C(ii) Billing on average basis for more than two bills 18.00 1064.00 1082.00 220.00 844.00 0.00 0.00 1064.00 18.00
D(i) Loose Wires 5.00 651.00 656.00 276.00 375.00 0.00 0.00 651.00 5.00
D(ii) Inadequate ground clearance 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
E(i) For current bills where no additional information is required 2.00 62.00 64.00 26.00 36.00 0.00 0.00 62.00 2.00
E(ii) Where additional information relating to correctness of reading etc. is required 19.00 345.00 364.00 150.00 195.00 0.00 0.00 345.00 19.00
F(i) Where extension of mains is not required 5.00 19.00 24.00 12.00 7.00 0.00 0.00 19.00 5.00
F(ii) Where extension of mains is required 1.00 0.00 1.00 0.00 0.00 0.00 0.00 0.00 1.00
F(iii) Modification in connected load 19.00 189.00 208.00 51.00 138.00 0.00 0.00 189.00 19.00
F(iv) Name change/reconnection 4.00 486.00 490.00 55.00 431.00 0.00 0.00 486.00 4.00
G Refund of amount due in regard to temporary connection 0.00 21.00 21.00 1.00 20.00 0.00 0.00 21.00 0.00
H Others 5.00 242.00 247.00 64.00 178.00 0.00 0.00 242.00 5.00
JND A(i) Loose connections from pole 8.00 18969.00 18977.00 12440.00 6524.00 5.00 0.00 18969.00 8.00
A(ii) Interruption due to line breakdown 3.00 7518.00 7521.00 4499.00 3019.00 0.00 0.00 7518.00 3.00
A(iii) Interruption due to failure of transformer 2.00 1667.00 1669.00 1045.00 621.00 1.00 0.00 1667.00 2.00
B(i) Ordinary case, which requires no augmentation. 2.00 120.00 122.00 67.00 53.00 0.00 0.00 120.00 2.00
B(ii) Where augmentation is required. 2.00 21.00 23.00 13.00 8.00 0.00 0.00 21.00 2.00
C(i) Stopped/Defective Meters 45.00 1092.00 1137.00 555.00 567.00 0.00 0.00 1122.00 15.00
C(ii) Billing on average basis for more than two bills 0.00 94.00 94.00 56.00 38.00 0.00 0.00 94.00 0.00
D(i) Loose Wires 20.00 1369.00 1389.00 799.00 576.00 0.00 0.00 1375.00 14.00
D(ii) Inadequate ground clearance 3.00 148.00 151.00 71.00 77.00 0.00 0.00 148.00 3.00
E(i) For current bills where no additional information is required 5.00 56.00 61.00 34.00 22.00 0.00 0.00 56.00 5.00
E(ii) Where additional information relating to correctness of reading etc. is required 3.00 110.00 113.00 60.00 50.00 0.00 0.00 110.00 3.00
F(i) Where extension of mains is not required 0.00 61.00 61.00 33.00 28.00 0.00 0.00 61.00 0.00
F(ii) Where extension of mains is required 0.00 27.00 27.00 13.00 14.00 0.00 0.00 27.00 0.00
F(iii) Modification in connected load 9.00 253.00 262.00 91.00 162.00 0.00 0.00 253.00 9.00
F(iv) Name change/reconnection 6.00 187.00 193.00 64.00 123.00 0.00 0.00 187.00 6.00
G Refund of amount due in regard to temporary connection 16.00 49.00 65.00 19.00 45.00 0.00 0.00 64.00 1.00
H Others 23.00 350.00 373.00 171.00 190.00 0.00 0.00 361.00 12.00
BVN A(i) Loose connections from pole 4.00 19263.00 19267.00 14804.00 4403.00 55.00 0.00 19262.00 5.00
A(ii) Interruption due to line breakdown 403.00 1935.00 2338.00 1195.00 748.00 6.00 0.00 1949.00 389.00
A(iii) Interruption due to failure of transformer 6.00 1517.00 1523.00 805.00 691.00 20.00 0.00 1516.00 7.00
B(i) Ordinary case, which requires no augmentation. 5.00 169.00 174.00 118.00 47.00 3.00 0.00 168.00 6.00
B(ii) Where augmentation is required. 7.00 142.00 149.00 72.00 69.00 1.00 0.00 142.00 7.00
C(i) Stopped/Defective Meters 29.00 2104.00 2133.00 1508.00 616.00 0.00 0.00 2124.00 9.00
C(ii) Billing on average basis for more than two bills 35.00 1139.00 1174.00 796.00 363.00 0.00 0.00 1159.00 15.00
D(i) Loose Wires 8.00 548.00 556.00 380.00 165.00 3.00 0.00 548.00 8.00
D(ii) Inadequate ground clearance 13.00 95.00 108.00 91.00 4.00 0.00 0.00 95.00 13.00
E(i) For current bills where no additional information is required 7.00 531.00 538.00 479.00 52.00 0.00 0.00 531.00 7.00
E(ii) Where additional information relating to correctness of reading etc. is required 13.00 694.00 707.00 453.00 241.00 0.00 0.00 694.00 13.00
F(i) Where extension of mains is not required 9.00 1080.00 1089.00 705.00 374.00 0.00 0.00 1079.00 10.00
F(ii) Where extension of mains is required 5.00 86.00 91.00 27.00 59.00 0.00 0.00 86.00 5.00
F(iii) Modification in connected load 14.00 422.00 436.00 301.00 120.00 0.00 0.00 421.00 15.00
F(iv) Name change/reconnection 12.00 3962.00 3974.00 3198.00 763.00 0.00 0.00 3961.00 13.00
G Refund of amount due in regard to temporary connection 29.00 193.00 222.00 121.00 69.00 2.00 0.00 192.00 30.00
H Others 560.00 28.00 588.00 225.00 276.00 0.00 0.00 501.00 87.00
BTD A(i) Loose connections from pole 7.00 1460.00 1467.00 1060.00 400.00 0.00 0.00 1460.00 7.00
A(ii) Interruption due to line breakdown 2.00 486.00 488.00 321.00 165.00 0.00 0.00 486.00 2.00
A(iii) Interruption due to failure of transformer 4.00 616.00 620.00 354.00 262.00 0.00 0.00 616.00 4.00
B(i) Ordinary case, which requires no augmentation. 5.00 9.00 14.00 6.00 3.00 0.00 0.00 9.00 5.00
B(ii) Where augmentation is required. 2.00 23.00 25.00 17.00 6.00 0.00 0.00 23.00 2.00
C(i) Stopped/Defective Meters 14.00 359.00 373.00 211.00 148.00 0.00 0.00 359.00 14.00
C(ii) Billing on average basis for more than two bills 16.00 100.00 116.00 76.00 24.00 0.00 0.00 100.00 16.00
D(i) Loose Wires 9.00 153.00 162.00 89.00 64.00 0.00 0.00 153.00 9.00
D(ii) Inadequate ground clearance 2.00 9.00 11.00 7.00 2.00 0.00 0.00 9.00 2.00
E(i) For current bills where no additional information is required 1.00 35.00 36.00 22.00 13.00 0.00 0.00 35.00 1.00
E(ii) Where additional information relating to correctness of reading etc. is required 1.00 30.00 31.00 18.00 12.00 0.00 0.00 30.00 1.00
F(i) Where extension of mains is not required 6.00 0.00 6.00 0.00 0.00 0.00 0.00 0.00 6.00
F(ii) Where extension of mains is required 0.00 5.00 5.00 3.00 2.00 0.00 0.00 5.00 0.00
F(iii) Modification in connected load 12.00 124.00 136.00 70.00 54.00 0.00 0.00 124.00 12.00
F(iv) Name change/reconnection 13.00 104.00 117.00 68.00 36.00 0.00 0.00 104.00 13.00
G Refund of amount due in regard to temporary connection 0.00 16.00 16.00 10.00 6.00 0.00 0.00 16.00 0.00
H Others 9.00 7.00 16.00 4.00 3.00 0.00 0.00 7.00 9.00
AMR A(i) Loose connections from pole 2.00 4555.00 4557.00 599.00 3763.00 193.00 0.00 4555.00 2.00
A(ii) Interruption due to line breakdown 4.00 1708.00 1712.00 271.00 1156.00 281.00 0.00 1708.00 4.00
A(iii) Interruption due to failure of transformer 5.00 3484.00 3489.00 605.00 2353.00 526.00 0.00 3484.00 5.00
B(i) Ordinary case, which requires no augmentation. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
B(ii) Where augmentation is required. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
C(i) Stopped/Defective Meters 40.00 684.00 724.00 154.00 431.00 99.00 0.00 684.00 40.00
C(ii) Billing on average basis for more than two bills 7.00 689.00 696.00 453.00 236.00 0.00 0.00 689.00 7.00
D(i) Loose Wires 48.00 230.00 278.00 50.00 126.00 54.00 0.00 230.00 48.00
D(ii) Inadequate ground clearance 2.00 119.00 121.00 30.00 68.00 21.00 0.00 119.00 2.00
E(i) For current bills where no additional information is required 0.00 388.00 388.00 144.00 244.00 0.00 0.00 388.00 0.00
E(ii) Where additional information relating to correctness of reading etc. is required 7.00 235.00 242.00 78.00 160.00 0.00 0.00 238.00 4.00
F(i) Where extension of mains is not required 4.00 379.00 383.00 136.00 219.00 24.00 0.00 379.00 4.00
F(ii) Where extension of mains is required 4.00 415.00 419.00 97.00 246.00 72.00 0.00 415.00 4.00
F(iii) Modification in connected load 98.00 890.00 988.00 171.00 584.00 135.00 0.00 890.00 98.00
F(iv) Name change/reconnection 3.00 539.00 542.00 207.00 332.00 0.00 0.00 539.00 3.00
G Refund of amount due in regard to temporary connection 21.00 101.00 122.00 20.00 78.00 9.00 0.00 107.00 15.00
H Others 23.00 132.00 155.00 27.00 88.00 17.00 0.00 132.00 23.00
SNR A(i) Loose connections from pole 5.00 1092.00 1097.00 590.00 502.00 0.00 0.00 1092.00 5.00
A(ii) Interruption due to line breakdown 5.00 938.00 943.00 725.00 213.00 0.00 0.00 938.00 5.00
A(iii) Interruption due to failure of transformer 4.00 750.00 754.00 290.00 460.00 0.00 0.00 750.00 4.00
B(i) Ordinary case, which requires no augmentation. 6.00 112.00 118.00 63.00 49.00 0.00 0.00 112.00 6.00
B(ii) Where augmentation is required. 0.00 101.00 101.00 42.00 59.00 0.00 0.00 101.00 0.00
C(i) Stopped/Defective Meters 3.00 465.00 468.00 315.00 150.00 0.00 0.00 465.00 3.00
C(ii) Billing on average basis for more than two bills 11.00 415.00 426.00 155.00 260.00 0.00 0.00 415.00 11.00
D(i) Loose Wires 1.00 692.00 693.00 305.00 387.00 0.00 0.00 692.00 1.00
D(ii) Inadequate ground clearance 0.00 188.00 188.00 88.00 100.00 0.00 0.00 188.00 0.00
E(i) For current bills where no additional information is required 27.00 412.00 439.00 215.00 197.00 0.00 0.00 412.00 27.00
E(ii) Where additional information relating to correctness of reading etc. is required 7.00 221.00 228.00 115.00 106.00 0.00 0.00 221.00 7.00
F(i) Where extension of mains is not required 2.00 401.00 403.00 108.00 293.00 0.00 0.00 401.00 2.00
F(ii) Where extension of mains is required 0.00 102.00 102.00 40.00 62.00 0.00 0.00 102.00 0.00
F(iii) Modification in connected load 19.00 388.00 407.00 92.00 296.00 0.00 0.00 388.00 19.00
F(iv) Name change/reconnection 34.00 92.00 126.00 45.00 47.00 0.00 0.00 92.00 34.00
G Refund of amount due in regard to temporary connection 13.00 95.00 108.00 42.00 53.00 0.00 0.00 95.00 13.00
H Others 11.00 641.00 652.00 255.00 386.00 0.00 0.00 641.00 11.00
PGVCL A(i) Loose connections from pole 100.00 83413.00 83513.00 48568.00 34634.00 254.00 0.00 83456.00 57.00
A(ii) Interruption due to line breakdown 435.00 41252.00 41687.00 19509.00 21469.00 288.00 0.00 41266.00 421.00
A(iii) Interruption due to failure of transformer 37.00 15383.00 15420.00 5860.00 8975.00 547.00 0.00 15382.00 38.00
B(i) Ordinary case, which requires no augmentation. 31.00 836.00 867.00 347.00 482.00 3.00 0.00 832.00 35.00
B(ii) Where augmentation is required. 26.00 1718.00 1744.00 599.00 1115.00 1.00 0.00 1715.00 29.00
C(i) Stopped/Defective Meters 167.00 12086.00 12253.00 6442.00 5604.00 99.00 0.00 12145.00 108.00
C(ii) Billing on average basis for more than two bills 122.00 4705.00 4827.00 2687.00 2037.00 0.00 0.00 4724.00 103.00
D(i) Loose Wires 105.00 8921.00 9026.00 4307.00 4562.00 57.00 0.00 8926.00 100.00
D(ii) Inadequate ground clearance 30.00 1239.00 1269.00 677.00 543.00 21.00 0.00 1241.00 28.00
E(i) For current bills where no additional information is required 63.00 3937.00 4000.00 2409.00 1527.00 0.00 0.00 3936.00 64.00
E(ii) Where additional information relating to correctness of reading etc. is required 96.00 3570.00 3666.00 2164.00 1412.00 0.00 0.00 3576.00 90.00
F(i) Where extension of mains is not required 37.00 2864.00 2901.00 1553.00 1286.00 24.00 0.00 2863.00 38.00
F(ii) Where extension of mains is required 17.00 1507.00 1524.00 713.00 722.00 72.00 0.00 1507.00 17.00
F(iii) Modification in connected load 169.00 3469.00 3638.00 1492.00 1840.00 135.00 0.00 3467.00 171.00
F(iv) Name change/reconnection 153.00 9225.00 9378.00 5714.00 3518.00 0.00 0.00 9232.00 146.00
G Refund of amount due in regard to temporary connection 128.00 823.00 951.00 384.00 445.00 15.00 0.00 844.00 107.00
H Others 696.00 6813.00 7509.00 3571.00 3741.00 17.00 0.00 7329.00 180.00
RED MARK SHOULD BE GREATER THAN 0. BLANK AUTO BLANK AUTO PUT IN FIRST COLUMN
COLUMN - D IS NOT EQUAL TO COLUMN - L