Performa SoP 003 B: APPENDIX-B (already in the SoP regulation)
REGISTER FOR COMPILING THE COMPLAINTS CLASSIFICATIONWISE
Name of Area / Circle Classification Pending complaints of previous Qtr Complaints received during the Qtr Total Complaints No. of Complaints redressed during the Qtr Balance Complaints to be redressed
(5) – (10)
In stipulated time Beyond stipulated time Total (6) to (9)
Within 50% of stipulated time. Within stipulated time. Up to double the stipulated time More than double the stipulated time
1 2   3 4 5 6 7 8 9 10 11  
PGVCL A(i) Loose connections from pole 12 52259 52271 27396 24738 51 7 52192 79
A(ii) Interruption due to line breakdown 19 19035 19054 9288 9722 12 0 19022 32
A(iii) Interruption due to failure of transformer 13 8169 8182 3595 4483 65 5 8148 34
B(i) Ordinary case, which requires no augmentation. 0 1515 1515 654 830 30 0 1514 1
B(ii) Where augmentation is required. 0 663 663 279 360 20 2 661 2
C(i) Stopped/Defective Meters 7 10084 10091 5165 4834 38 0 10037 54
C(ii) Billing on average basis for more than two bills 10 4025 4035 1476 2531 22 0 4029 6
D(i) Loose Wires 4 5972 5976 3334 2595 36 3 5968 8
D(ii) Inadequate ground clearance 0 1182 1182 443 718 20 0 1181 1
E(i) For current bills where no additional information is required 21 2847 2868 1621 1205 21 0 2847 21
E(ii) Where additional information relating to correctness of reading etc. is required 0 2819 2819 1015 1798 6 0 2819 0
F(i) Where extension of mains is not required 19 2524 2543 938 1559 30 0 2527 16
F(ii) Where extension of mains is required 0 1436 1436 390 1023 15 4 1432 4
F(iii) Modification in connected load 17 2031 2048 863 1150 18 0 2031 17
F(iv) Name change/reconnection 51 9968 10019 2372 7579 25 2 9978 41
G Refund of amount due in regard to temporary connection 26 976 1002 473 501 18 0 992 10
H Others 61 5102 5163 1786 3311 22 5 5124 39