Performa SoP 003 B: APPENDIX-B (already in the SoP regulation) | |||||||||||||
REGISTER FOR COMPILING THE COMPLAINTS CLASSIFICATIONWISE | |||||||||||||
Name of Area / Circle | Qtr | Classification | Pending complaints of previous Qtr | Complaints received during the Qtr | Total Complaints | No. of Complaints redressed during the Qtr | Balance Complaints to
be redressed (5) – (10) |
||||||
In stipulated time | Beyond stipulated time | Total (6) to (9) | |||||||||||
Within 50% of stipulated time. | Within stipulated time. | Up to double the stipulated time | More than double the stipulated time | ||||||||||
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | |||
Apr'09 to Jun'09 | A(i) | Loose connections from pole | 230 | 93648 | 93878 | 45757 | 45038 | 2930 | 41 | 93766 | 112 | ||
A(ii) | Interruption due to line breakdown | 116 | 20247 | 20363 | 8348 | 11580 | 392 | 14 | 20334 | 29 | |||
A(iii) | Interruption due to failure of transformer | 147 | 8399 | 8546 | 3419 | 4759 | 307 | 3 | 8488 | 58 | |||
B(i) | Ordinary case, which requires no augmentation. | 28 | 5462 | 5490 | 2720 | 2693 | 70 | 0 | 5483 | 7 | |||
B(ii) | Where augmentation is required. | 14 | 1015 | 1029 | 343 | 653 | 25 | 0 | 1021 | 8 | |||
C(i) | Stopped/Defective Meters | 271 | 9919 | 10190 | 3865 | 5775 | 393 | 43 | 10076 | 114 | |||
C(ii) | Billing on average basis for more than two bills | 27 | 3565 | 3592 | 1165 | 2168 | 116 | 138 | 3587 | 5 | |||
D(i) | Loose Wires | 112 | 4535 | 4647 | 1696 | 2702 | 185 | 20 | 4603 | 44 | |||
D(ii) | Inadequate ground clearance | 15 | 1704 | 1719 | 486 | 1215 | 18 | 0 | 1719 | 0 | |||
E(i) | For current bills where no additional information is required | 0 | 6228 | 6228 | 1954 | 4109 | 154 | 0 | 6217 | 11 | |||
E(ii) | Where additional information relating to correctness of reading etc. is required | 177 | 2569 | 2746 | 858 | 1835 | 27 | 0 | 2720 | 26 | |||
F(i) | Where extension of mains is not required | 0 | 3542 | 3542 | 1352 | 2128 | 62 | 0 | 3542 | 0 | |||
F(ii) | Where extension of mains is required | 18 | 2761 | 2779 | 511 | 2252 | 14 | 0 | 2777 | 2 | |||
F(iii) | Modification in connected load | 81 | 1740 | 1821 | 661 | 1094 | 19 | 0 | 1774 | 47 | |||
F(iv) | Name change/reconnection | 829 | 13754 | 14583 | 7301 | 6735 | 253 | 0 | 14289 | 294 | |||
G | Refund of amount due in regard to temporary connection | 48 | 1016 | 1064 | 414 | 623 | 21 | 2 | 1060 | 4 | |||
H | Others | 23 | 1699 | 1722 | 668 | 1014 | 40 | 0 | 1722 | 0 | |||
July'09 to Sept'09 | A(i) | Loose connections from pole | 112 | 97250 | 97362 | 44415 | 49708 | 3082 | 39 | 97244 | 118 | ||
A(ii) | Interruption due to line breakdown | 29 | 23016 | 23045 | 9070 | 13503 | 427 | 10 | 23010 | 35 | |||
A(iii) | Interruption due to failure of transformer | 58 | 9480 | 9538 | 4079 | 5097 | 301 | 3 | 9480 | 58 | |||
B(i) | Ordinary case, which requires no augmentation. | 7 | 5523 | 5530 | 2633 | 2851 | 35 | 0 | 5519 | 11 | |||
B(ii) | Where augmentation is required. | 8 | 1340 | 1348 | 348 | 960 | 32 | 0 | 1340 | 8 | |||
C(i) | Stopped/Defective Meters | 114 | 10453 | 10567 | 4056 | 6080 | 316 | 5 | 10457 | 110 | |||
C(ii) | Billing on average basis for more than two bills | 5 | 4827 | 4832 | 1476 | 3264 | 92 | 0 | 4832 | 0 | |||
D(i) | Loose Wires | 44 | 5392 | 5436 | 1975 | 3288 | 129 | 0 | 5392 | 44 | |||
D(ii) | Inadequate ground clearance | 0 | 1894 | 1894 | 629 | 1247 | 18 | 0 | 1894 | 0 | |||
E(i) | For current bills where no additional information is required | 11 | 6729 | 6740 | 2068 | 4512 | 155 | 0 | 6735 | 5 | |||
E(ii) | Where additional information relating to correctness of reading etc. is required | 26 | 2837 | 2863 | 993 | 1829 | 20 | 0 | 2842 | 21 | |||
F(i) | Where extension of mains is not required | 0 | 3713 | 3713 | 1119 | 2380 | 79 | 0 | 3578 | 135 | |||
F(ii) | Where extension of mains is required | 2 | 3563 | 3565 | 486 | 2919 | 15 | 0 | 3420 | 145 | |||
F(iii) | Modification in connected load | 47 | 2061 | 2108 | 732 | 1313 | 17 | 0 | 2062 | 46 | |||
F(iv) | Name change/reconnection | 294 | 14805 | 15099 | 6523 | 8108 | 235 | 0 | 14866 | 233 | |||
G | Refund of amount due in regard to temporary connection | 4 | 912 | 916 | 382 | 520 | 14 | 0 | 916 | 0 | |||
H | Others | 0 | 1814 | 1814 | 809 | 971 | 33 | 0 | 1813 | 1 | |||
Oct'09 to Dec'09 | A(i) | Loose connections from pole | 118 | 84824 | 84942 | 48505 | 33650 | 2742 | 20 | 84917 | 25 | ||
A(ii) | Interruption due to line breakdown | 35 | 14721 | 14756 | 8479 | 5916 | 315 | 5 | 14715 | 41 | |||
A(iii) | Interruption due to failure of transformer | 58 | 8093 | 8151 | 4246 | 3609 | 251 | 1 | 8107 | 44 | |||
B(i) | Ordinary case, which requires no augmentation. | 11 | 5327 | 5338 | 3861 | 1440 | 30 | 0 | 5331 | 7 | |||
B(ii) | Where augmentation is required. | 8 | 966 | 974 | 353 | 589 | 24 | 0 | 966 | 8 | |||
C(i) | Stopped/Defective Meters | 110 | 9289 | 9399 | 3806 | 5207 | 275 | 0 | 9288 | 111 | |||
C(ii) | Billing on average basis for more than two bills | 0 | 3786 | 3786 | 1741 | 1944 | 101 | 0 | 3786 | 0 | |||
D(i) | Loose Wires | 44 | 4330 | 4374 | 1586 | 2582 | 162 | 0 | 4330 | 44 | |||
D(ii) | Inadequate ground clearance | 0 | 1020 | 1020 | 427 | 574 | 19 | 0 | 1020 | 0 | |||
E(i) | For current bills where no additional information is required | 5 | 6164 | 6169 | 2192 | 3827 | 150 | 0 | 6169 | 0 | |||
E(ii) | Where additional information relating to correctness of reading etc. is required | 21 | 2610 | 2631 | 1181 | 1411 | 18 | 0 | 2610 | 21 | |||
F(i) | Where extension of mains is not required | 135 | 3699 | 3834 | 1319 | 2308 | 77 | 0 | 3704 | 130 | |||
F(ii) | Where extension of mains is required | 145 | 2787 | 2932 | 609 | 2163 | 15 | 0 | 2787 | 145 | |||
F(iii) | Modification in connected load | 46 | 1786 | 1832 | 688 | 1084 | 14 | 0 | 1786 | 46 | |||
F(iv) | Name change/reconnection | 233 | 14727 | 14960 | 7718 | 6874 | 231 | 0 | 14823 | 137 | |||
G | Refund of amount due in regard to temporary connection | 0 | 820 | 820 | 381 | 417 | 13 | 0 | 811 | 9 | |||
H | Others | 1 | 1728 | 1729 | 1024 | 689 | 16 | 0 | 1729 | 0 | |||
PGVCL | Jan'10 to Mar'10 | A(i) | Loose connections from pole | 25 | 64635 | 64660 | 32313 | 29281 | 2100 | 0 | 63694 | 966 | |
A(ii) | Interruption due to line breakdown | 41 | 12614 | 12655 | 6356 | 5655 | 314 | 1 | 12326 | 329 | |||
A(iii) | Interruption due to failure of transformer | 44 | 6463 | 6507 | 2878 | 3238 | 248 | 0 | 6364 | 144 | |||
B(i) | Ordinary case, which requires no augmentation. | 7 | 4905 | 4912 | 3379 | 1516 | 10 | 0 | 4905 | 7 | |||
B(ii) | Where augmentation is required. | 8 | 856 | 864 | 276 | 541 | 24 | 0 | 841 | 23 | |||
C(i) | Stopped/Defective Meters | 111 | 9253 | 9364 | 3199 | 5794 | 260 | 0 | 9253 | 111 | |||
C(ii) | Billing on average basis for more than two bills | 0 | 3325 | 3325 | 1411 | 1836 | 78 | 0 | 3325 | 0 | |||
D(i) | Loose Wires | 44 | 4498 | 4542 | 1641 | 2720 | 137 | 0 | 4498 | 44 | |||
D(ii) | Inadequate ground clearance | 0 | 951 | 951 | 394 | 539 | 18 | 0 | 951 | 0 | |||
E(i) | For current bills where no additional information is required | 0 | 4934 | 4889 | 2077 | 2768 | 44 | 0 | 4889 | 0 | |||
E(ii) | Where additional information relating to correctness of reading etc. is required | 21 | 1955 | 1976 | 1170 | 767 | 18 | 0 | 1955 | 21 | |||
F(i) | Where extension of mains is not required | 130 | 3300 | 3430 | 1530 | 1854 | 45 | 0 | 3430 | 1 | |||
F(ii) | Where extension of mains is required | 145 | 2443 | 2588 | 666 | 1907 | 15 | 0 | 2588 | 0 | |||
F(iii) | Modification in connected load | 46 | 1589 | 1635 | 665 | 911 | 13 | 0 | 1589 | 46 | |||
F(iv) | Name change/reconnection | 137 | 10998 | 11135 | 5339 | 5482 | 210 | 0 | 11031 | 104 | |||
G | Refund of amount due in regard to temporary connection | 9 | 694 | 703 | 359 | 311 | 18 | 0 | 687 | 16 | |||
H | Others | 0 | 1441 | 1442 | 905 | 520 | 16 | 0 | 1441 | 1 |