Performa SoP 016: Release of New Connection status
  COMPENSATION DETAILS
  Sr. No Event Compensation No of cases where compensation was given (in numbers) Amt of compensation paid (in Rs.)
RJC 1 Duty to provide supply NIL NIL NIL
a) New Connection NIL NIL
b) Additional Load NIL NIL
c) Temporary supply NIL NIL
d) Shifting service connection NIL NIL
e)Transfer of service connection NIL NIL
f) Change in tariff category of consumer NIL NIL
2 Complaints in billing NIL NIL NIL
3 Replacement of meters NIL NIL NIL
4 Interruption of supply NIL NIL NIL
5 Voltage fluctuations and complaints NIL NIL NIL
6 Responding to consumer's complaints NIL NIL NIL
7 Grievance Handling NIL NIL NIL
TOTAL     
       
RJR 6.36 Duty to provide supply Rs. 50 per day of delay from the limit specified in the performance regulations 0 0        
a) New Connection 0 0        
b) Additional Load 0 0        
c) Temporary supply 0 0        
d) Shifting service connection 0 0        
e)Transfer of service connection 0 0        
f) Change in tariff category of consumer 0 0        
9.75 Complaints in billing Rs. 50 for non reply within the period prescribed in Regulations 0 0        
10.2 Replacement of meters LT- Rs. 25 per day of delay - maximum Rs.2,500 and HT - Rs. 250 per day of delay - maximum of Rs.5,000 0 0
10.7 Interruption of supply LT- Rs. 25 for every 6 hrs of delay- maximum of Rs. 500 and HT- Rs. 50 for every 6 hrs delay- maximum Rs. 1000/- 0 0
11.2 Voltage fluctuations and complaints Rs. 50 for failure to visit or convey findings within the stipulated period 0 0
11.7 Responding to consumer's complaints Rs. 25 for each day of delay- maximum Rs. 500 0 0
12.2 Grievance Handling Rs.25 for failure in handling grievance 0 0
TOTAL     
PBR 12.7 Duty to provide supply Rs. 50 per day of delay from the limit specified in the performance regulations 0 0
a) New Connection 0 0
b) Additional Load 0 0
c) Temporary supply 0 0
d) Shifting service connection 0 0
e)Transfer of service connection 0 0
f) Change in tariff category of consumer 0 0
16.1 Complaints in billing Rs. 50 for non reply within the period prescribed in Regulations 0 0
16.5 Replacement of meters LT- Rs. 25 per day of delay - maximum Rs.2,500 and HT - Rs. 250 per day of delay - maximum of Rs.5,000 0 0
17 Interruption of supply LT- Rs. 25 for every 6 hrs of delay- maximum of Rs. 500 and HT- Rs. 50 for every 6 hrs delay- maximum Rs. 1000/- 0 0
17.5 Voltage fluctuations and complaints Rs. 50 for failure to visit or convey findings within the stipulated period 0 0
18 Responding to consumer's complaints Rs. 25 for each day of delay- maximum Rs. 500 0 0
18.5 Grievance Handling Rs.25 for failure in handling grievance 0 0
TOTAL     
JMN 19 Duty to provide supply Nil Nil Nil
a) New Connection
b) Additional Load
c) Temporary supply
d) Shifting service connection
e)Transfer of service connection
f) Change in tariff category of consumer
22.4 Complaints in billing Nil Nil Nil
22.8 Replacement of meters Nil Nil Nil
23.3 Interruption of supply Nil Nil Nil
23.8 Voltage fluctuations and complaints Nil Nil Nil
24.3 Responding to consumer's complaints Nil Nil Nil
24.8 Grievance Handling      
TOTAL     
BHJ 25.3 Duty to provide supply Rs. 50 per day of delay from the limit specified in the performance regulations 0.00 0.00
a) New Connection 0.00 0.00
b) Additional Load 0.00 0.00
c) Temporary supply 0.00 0.00
d) Shifting service connection 0.00 0.00
e)Transfer of service connection 0.00 0.00
f) Change in tariff category of consumer 0.00 0.00
28.7 Complaints in billing Rs. 50 for non reply within the period prescribed in Regulations 0.00 0.00
29.1 Replacement of meters LT- Rs. 25 per day of delay - maximum Rs.2,500 and HT - Rs. 250 per day of delay - maximum of Rs.5,000 0.00 0.00
29.6 Interruption of supply LT- Rs. 25 for every 6 hrs of delay- maximum of Rs. 500 and HT- Rs. 50 for every 6 hrs delay- maximum Rs. 1000/- 0.00 0.00
30.1 Voltage fluctuations and complaints Rs. 50 for failure to visit or convey findings within the stipulated period 0.00 0.00
30.6 Responding to consumer's complaints Rs. 25 for each day of delay- maximum Rs. 500 0.00 0.00
31.1 Grievance Handling Rs.25 for failure in handling grievance 0.00 0.00
TOTAL     
JND 31.6 Duty to provide supply Nil Nil Nil
a) New Connection
b) Additional Load
c) Temporary supply
d) Shifting service connection
e)Transfer of service connection
f) Change in tariff category of consumer
35 Complaints in billing Nil Nil Nil
35.5 Replacement of meters Nil Nil Nil
35.9 Interruption of supply Nil Nil Nil
36.4 Voltage fluctuations and complaints Nil Nil Nil
36.9 Responding to consumer's complaints Nil Nil Nil
37.4 Grievance Handling      
TOTAL     
BVN 37.9 Duty to provide supply Rs. 50 per day of delay from the limit specified in the performance regulations    
a) New Connection    
b) Additional Load    
c) Temporary supply    
d) Shifting service connection    
e)Transfer of service connection    
f) Change in tariff category of consumer    
41.3 Complaints in billing Rs. 50 for non reply within the period prescribed in Regulations    
41.8 Replacement of meters LT- Rs. 25 per day of delay - maximum Rs.2,500 and HT - Rs. 250 per day of delay - maximum of Rs.5,000    
42.2 Interruption of supply LT- Rs. 25 for every 6 hrs of delay- maximum of Rs. 500 and HT- Rs. 50 for every 6 hrs delay- maximum Rs. 1000/-    
42.7 Voltage fluctuations and complaints Rs. 50 for failure to visit or convey findings within the stipulated period    
43.2 Responding to consumer's complaints Rs. 25 for each day of delay- maximum Rs. 500    
43.7 Grievance Handling Rs.25 for failure in handling grievance    
TOTAL     
AMR 44.2 Duty to provide supply      
a) New Connection    
b) Additional Load    
c) Temporary supply    
d) Shifting service connection    
e)Transfer of service connection    
f) Change in tariff category of consumer    
47.6 Complaints in billing      
48.1 Replacement of meters      
48.5 Interruption of supply      
49 Voltage fluctuations and complaints      
49.5 Responding to consumer's complaints      
50 Grievance Handling      
TOTAL     
SNR 50.5 Duty to provide supply Rs. 50 per day of delay from the limit specified in the performance regulations Nil
a) New Connection    
b) Additional Load    
c) Temporary supply    
d) Shifting service connection    
e)Transfer of service connection    
f) Change in tariff category of consumer    
53.9 Complaints in billing Rs. 50 for non reply within the period prescribed in Regulations    
54.4 Replacement of meters LT- Rs. 25 per day of delay - maximum Rs.2,500 and HT - Rs. 250 per day of delay - maximum of Rs.5,000    
54.8 Interruption of supply LT- Rs. 25 for every 6 hrs of delay- maximum of Rs. 500 and HT- Rs. 50 for every 6 hrs delay- maximum Rs. 1000/-    
55.3 Voltage fluctuations and complaints Rs. 50 for failure to visit or convey findings within the stipulated period    
55.8 Responding to consumer's complaints Rs. 25 for each day of delay- maximum Rs. 500    
56.3 Grievance Handling Rs.25 for failure in handling grievance    
TOTAL     
PGVCL 56.8 Duty to provide supply Rs. 50 per day of delay from the limit specified in the performance regulations N I L
a) New Connection
b) Additional Load
c) Temporary supply
d) Shifting service connection
e)Transfer of service connection
f) Change in tariff category of consumer
60.2 Complaints in billing Rs. 50 for non reply within the period prescribed in Regulations
60.7 Replacement of meters LT- Rs. 25 per day of delay - maximum Rs.2,500 and HT - Rs. 250 per day of delay - maximum of Rs.5,001
61.2 Interruption of supply LT- Rs. 25 for every 6 hrs of delay- maximum of Rs. 500 and HT- Rs. 50 for every 6 hrs delay- maximum Rs. 1000/-
61.6 Voltage fluctuations and complaints Rs. 50 for failure to visit or convey findings within the stipulated period
62.1 Responding to consumer's complaints Rs. 25 for each day of delay- maximum Rs. 501
62.6 Grievance Handling Rs.25 for failure in handling grievance
TOTAL