Performa SoP 012 - System Losses at EHT / 11
KV and Below |
|
1 HALF UPTO
APR-21 TO SEP -21 |
|
|
Losses in
11 KV System and Connected Equipment |
|
|
|
i |
Energy
Delivered into EHT / 11 KV and LT Distribution System from EHT/11 KV SSs
(MUs) |
A (SENT) |
18929.99 |
|
ii |
Energy Sold (Billed). EHT direct sales (MUs) |
B (EHT SOLD) |
2128.21 |
|
iii |
Energy Sold (Billed) in the 11 KV LT system (MUs) |
C (TOTAL EXCL. EHT) |
13583.94 |
|
iv |
Total Sales (MUs) |
(B+C) |
15712.15 |
|
v |
Losses (MUs) |
{(A) - (B+C)} |
3217.84 |
|
vi |
% Losses |
{(A) - (B+C)} X 100 / (A) |
17.00 |
|
2 HALF UPTO
OCT-20 TO MAR-21 |
|
|
Performa
SoP 012 - System Losses at EHT / 11 KV and Below |
|
Losses in
11 KV System and Connected Equipment |
|
|
|
i |
Energy
Delivered into EHT / 11 KV and LT Distribution System from EHT/11 KV SSs
(MUs) |
A (SENT) |
19653.08 |
|
ii |
Energy Sold (Billed). EHT direct sales (MUs) |
B (EHT SOLD) |
2480.48 |
|
iii |
Energy Sold (Billed) in the 11 KV LT system (MUs) |
C (TOTAL EXCL. EHT) |
14573.21 |
|
iv |
Total Sales (MUs) |
(B+C) |
17053.68 |
|
v |
Losses (MUs) |
{(A) - (B+C)} |
2599.39 |
|
vi |
% Losses |
{(A) - (B+C)} X 100 / (A) |
13.23 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|