Performa SoP 003 B: APPENDIX-B (already in the SoP regulation)
REGISTER FOR COMPILING THE COMPLAINTS CLASSIFICATIONWISE
Name of Area / Circle Classification   Pending complaints of previous Qtr Complaints received during the Qtr Total Complaints No. of Complaints redressed during the Qtr Balance Complaints to be redressed
(5) – (10)
  In stipulated time Beyond stipulated time Total (6) to (9)
  Within 50% of stipulated time. Within stipulated time. Up to double the stipulated time More than double the stipulated time
1 2   3 4.00 5 6.00 7.00 8.00 9.00 10 11      
PGVCL A(i) Loose connections from pole 0 43742 43742 23715 19854 130 7 43706 36 FALSE
A(ii) Interruption due to line breakdown 18 16311 16329 7931 8214 163 12 16320 9 FALSE
A(iii) Interruption due to failure of transformer 0 7436 7436 4145 3259 6 8 7418 18 FALSE
B(i) Ordinary case, which requires no augmentation. 9 952 961 589 349 8 0 946 15 FALSE
B(ii) Where augmentation is required. 0 970 970 455 488 20 4 967 3 FALSE
C(i) Stopped/Defective Meters 12 11280 11292 5749 5468 48 11 11276 16 FALSE
C(ii) Billing on average basis for more than two bills 0 3863 3863 1787 2017 18 1 3823 40 FALSE
D(i) Loose Wires 0 5833 5833 2643 3156 22 6 5827 6 FALSE
D(ii) Inadequate ground clearance 0 1219 1219 565 633 19 0 1217 2 FALSE
E(i) For current bills where no additional information is required 11 3431 3442 1867 1527 28 8 3430 12 FALSE
E(ii) Where additional information relating to correctness of reading etc. is required 0 3307 3307 1577 1717 5 0 3299 8 FALSE
F(i) Where extension of mains is not required 5 1815 1820 758 1024 18 14 1814 6 FALSE
F(ii) Where extension of mains is required 0 1035 1035 497 524 7 0 1028 7 FALSE
F(iii) Modification in connected load 6 2600 2606 1332 1229 30 1 2592 14 FALSE
F(iv) Name change/reconnection 28 14702 14730 4914 9708 34 3 14659 71 FALSE
G Refund of amount due in regard to temporary connection 0 843 843 397 419 1 0 817 26 FALSE
H Others 34 4058 4092 2248 1755 15 5 4023 69 FALSE