Performa SoP 003 B: APPENDIX-B (already in the SoP regulation)
REGISTER FOR COMPILING THE COMPLAINTS CLASSIFICATIONWISE
Name of Area / Circle Classification Pending complaints of previous Qtr Complaints received during the Qtr Total Complaints No. of Complaints redressed during the Qtr Balance Complaints to be redressed
(5) – (10)
In stipulated time Beyond stipulated time Total (6) to (9)
Within 50% of stipulated time. Within stipulated time. Up to double the stipulated time More than double the stipulated time
1 2 3 4 5 6 7 8 9 10 11      
PGVCL A(i) Loose connections from pole 118 84824 84942 48505 33650 2742 20 84917 25 FALSE
A(ii) Interruption due to line breakdown 35 14721 14756 8479 5916 315 5 14715 41 FALSE
A(iii) Interruption due to failure of transformer 58 8093 8151 4246 3609 251 1 8107 44 FALSE
B(i) Ordinary case, which requires no augmentation. 11 5327 5338 3861 1440 30 0 5331 7 FALSE
B(ii) Where augmentation is required. 8 966 974 353 589 24 0 966 8 TRUE
C(i) Stopped/Defective Meters 110 9289 9399 3806 5207 275 0 9288 111 FALSE
C(ii) Billing on average basis for more than two bills 0 3786 3786 1741 1944 101 0 3786 0 TRUE
D(i) Loose Wires 44 4330 4374 1586 2582 162 0 4330 44 TRUE
D(ii) Inadequate ground clearance 0 1020 1020 427 574 19 0 1020 0 TRUE
E(i) For current bills where no additional information is required 5 6164 6169 2192 3827 150 0 6169 0 FALSE
E(ii) Where additional information relating to correctness of reading etc. is required 21 2610 2631 1181 1411 18 0 2610 21 TRUE
F(i) Where extension of mains is not required 135 3699 3834 1319 2308 77 0 3704 130 FALSE
F(ii) Where extension of mains is required 145 2787 2932 609 2163 15 0 2787 145 TRUE
F(iii) Modification in connected load 46 1786 1832 688 1084 14 0 1786 46 TRUE
F(iv) Name change/reconnection 233 14727 14960 7718 6874 231 0 14823 137 FALSE
G Refund of amount due in regard to temporary connection 0 820 820 381 417 13 0 811 9 FALSE
H Others 1 1728 1729 1024 689 16 0 1729 0 FALSE