Performa SoP 007: Failure of Power Transformer
Sr. No. Name of Area/Circle No. of existing Power Transformers at the start of the quarter / year no. of Power Transformers added during the quarter / year Total number of Power Transformers Total number of   Power transformer failed % failure rate of Power transformer
    A B C=A+B D H = (D)*100/C
1 PGVCL Not Applicable