Performa SoP 003 B: APPENDIX-B (already in the SoP regulation)
REGISTER FOR COMPILING THE COMPLAINTS CLASSIFICATIONWISE
Name of Area / Circle Classification Pending complaints of previous Qtr Complaints received during the Qtr Total Complaints No. of Complaints redressed during the Qtr Balance Complaints to be redressed
(5) – (10)
In stipulated time Beyond stipulated time Total (6) to (9)
Within 50% of stipulated time. Within stipulated time. Up to double the stipulated time More than double the stipulated time
1 2   3 4 5 6 7 8 9 10 11
PGVCL A(i) Loose connections from pole 41 130238 130279 86432 43271 500 32 130235 44
A(ii) Interruption due to line breakdown 28 89907 89935 48271 41161 440 33 89905 30
A(iii) Interruption due to failure of transformer 48 32528 32576 16614 14806 836 260 32516 60
B(i) Ordinary case, which requires no augmentation. 18 3427 3445 1855 1458 75 28 3416 29
B(ii) Where augmentation is required. 37 2007 2044 983 926 85 7 2001 43
C(i) Stopped/Defective Meters 34 21398 21432 11745 9529 85 30 21389 43
C(ii) Billing on average basis for more than two bills 19 9171 9190 5872 3064 161 60 9157 33
D(i) Loose Wires 35 15575 15610 8849 6626 82 10 15567 43
D(ii) Inadequate ground clearance 1 4282 4283 2338 1718 219 7 4282 1
E(i) For current bills where no additional information is required 5 5127 5132 2930 2093 84 17 5124 8
E(ii) Where additional information relating to correctness of reading etc. is required 10 5301 5311 3160 2009 69 62 5300 11
F(i) Where extension of mains is not required 3 2792 2795 1823 928 38 3 2792 3
F(ii) Where extension of mains is required 2 2115 2117 1177 858 71 6 2112 5
F(iii) Modification in connected load 12 4306 4318 2435 1785 73 7 4300 18
F(iv) Name change/reconnection 16 8101 8117 4515 3489 62 34 8100 17
G Refund of amount due in regard to temporary connection 10 2601 2611 1320 1248 21 5 2594 17
H Others 259 22434 22693 12671 9309 224 234 22438 255