Performa SoP 016: Release of New Connection status
PGVCL Duty to provide supply Rs. 50 per day of delay from the limit specified in the performance regulations N I L
a) New Connection
b) Additional Load
c) Temporary supply
d) Shifting service connection
e)Transfer of service connection
f) Change in tariff category of consumer
Complaints in billing Rs. 50 for non reply within the period prescribed in Regulations
Replacement of meters LT- Rs. 25 per day of delay - maximum Rs.2,500 and HT - Rs. 250 per day of delay - maximum of Rs.5,001
Interruption of supply LT- Rs. 25 for every 6 hrs of delay- maximum of Rs. 500 and HT- Rs. 50 for every 6 hrs delay- maximum Rs. 1000/-
Voltage fluctuations and complaints Rs. 50 for failure to visit or convey findings within the stipulated period
Responding to consumer's complaints Rs. 25 for each day of delay- maximum Rs. 501
Grievance Handling Rs.25 for failure in handling grievance