Performa SoP 016: Release of New Connection status |
|
PGVCL |
Duty
to provide supply |
Rs. 50 per
day of delay from the limit specified in the performance regulations |
N I L |
a) New Connection |
b) Additional Load |
c) Temporary supply |
d) Shifting service connection |
e)Transfer of service
connection |
f) Change in tariff category of
consumer |
Complaints in billing |
Rs. 50 for non reply within the period prescribed in Regulations |
Replacement of meters |
LT- Rs. 25 per day of delay - maximum Rs.2,500 and HT - Rs. 250
per day of delay - maximum of Rs.5,001 |
Interruption of supply |
LT- Rs. 25 for every 6 hrs of delay- maximum of Rs. 500 and HT-
Rs. 50 for every 6 hrs delay- maximum Rs. 1000/- |
Voltage fluctuations and
complaints |
Rs. 50 for failure to visit or convey findings within the
stipulated period |
Responding to consumer's
complaints |
Rs. 25 for each day of delay- maximum Rs. 501 |
Grievance Handling |
Rs.25 for failure in handling grievance |
|
|
|
|
|
|
|
|