Performa SoP 016: Release of New Connection status |
|
|
|
|
|
|
COMPENSATION
DETAILS |
|
|
|
Sr. No |
Event |
Compensation |
No of cases where compensation was given (in numbers) |
Amt of compensation paid (in Rs.) |
|
|
RJC |
1 |
Duty
to provide supply |
NIL |
NIL |
NIL |
|
|
a) New
Connection |
NIL |
NIL |
|
|
b)
Additional Load |
NIL |
NIL |
|
|
c)
Temporary supply |
NIL |
NIL |
|
|
d) Shifting service connection |
NIL |
NIL |
|
|
e)Transfer of service connection |
NIL |
NIL |
|
|
f) Change in tariff category of consumer |
NIL |
NIL |
|
|
2 |
Complaints in billing |
NIL |
NIL |
NIL |
|
|
3 |
Replacement of meters |
NIL |
NIL |
NIL |
|
|
4 |
Interruption of supply |
NIL |
NIL |
NIL |
|
|
5 |
Voltage fluctuations and complaints |
NIL |
NIL |
NIL |
|
|
6 |
Responding to consumer's complaints |
NIL |
NIL |
NIL |
|
|
7 |
Grievance Handling |
NIL |
NIL |
NIL |
|
|
TOTAL |
|
|
|
|
|
|
|
|
RJR |
6.4 |
Duty to provide supply |
Rs. 50 per day of delay from the limit specified in the
performance regulations |
0 |
0 |
|
|
|
|
a) New
Connection |
0 |
0 |
|
|
|
|
b)
Additional Load |
0 |
0 |
|
|
|
|
c)
Temporary supply |
0 |
0 |
|
|
|
|
d) Shifting service connection |
0 |
0 |
|
|
|
|
e)Transfer of service connection |
0 |
0 |
|
|
|
|
f) Change in tariff category of consumer |
0 |
0 |
|
|
|
|
9.8 |
Complaints in billing |
Rs. 50 for non reply within the period prescribed in Regulations |
0 |
0 |
|
|
|
|
10 |
Replacement of meters |
LT- Rs. 25 per day of delay - maximum Rs.2,500 and HT - Rs. 250
per day of delay - maximum of Rs.5,000 |
0 |
0 |
|
11 |
Interruption of supply |
LT- Rs. 25 for every 6 hrs of delay- maximum of Rs. 500 and HT-
Rs. 50 for every 6 hrs delay- maximum Rs. 1000/- |
0 |
0 |
|
11 |
Voltage fluctuations and complaints |
Rs. 50 for failure to visit or convey findings within the
stipulated period |
0 |
0 |
|
12 |
Responding to consumer's complaints |
Rs. 25 for each day of delay- maximum Rs. 500 |
0 |
0 |
|
12 |
Grievance Handling |
Rs.25 for failure in handling grievance |
0 |
0 |
|
TOTAL |
|
|
|
|
PBR |
13 |
Duty to provide supply |
Rs. 50 per
day of delay from the limit specified in the performance regulations |
0 |
0 |
|
a) New
Connection |
0 |
0 |
|
b)
Additional Load |
0 |
0 |
|
c)
Temporary supply |
0 |
0 |
|
d) Shifting service connection |
0 |
0 |
|
e)Transfer of service connection |
0 |
0 |
|
f) Change in tariff category of consumer |
0 |
0 |
|
16 |
Complaints in billing |
Rs.
50 for non reply within the period prescribed in Regulations |
0 |
0 |
|
17 |
Replacement of meters |
LT-
Rs. 25 per day of delay - maximum Rs.2,500 and HT - Rs. 250 per day of delay
- maximum of Rs.5,000 |
0 |
0 |
|
17 |
Interruption of supply |
LT-
Rs. 25 for every 6 hrs of delay- maximum of Rs. 500 and HT- Rs. 50 for every
6 hrs delay- maximum Rs. 1000/- |
0 |
0 |
|
18 |
Voltage fluctuations and complaints |
Rs.
50 for failure to visit or convey findings within the stipulated period |
0 |
0 |
|
18 |
Responding to consumer's complaints |
Rs.
25 for each day of delay- maximum Rs. 500 |
0 |
0 |
|
18 |
Grievance Handling |
Rs.25
for failure in handling grievance |
0 |
0 |
|
TOTAL |
|
|
|
|
JMN |
19 |
Duty to provide supply |
Nil |
Nil |
Nil |
|
a) New
Connection |
|
b)
Additional Load |
|
c)
Temporary supply |
|
d) Shifting service connection |
|
e)Transfer of service connection |
|
f) Change in tariff category of consumer |
|
22 |
Complaints in billing |
Nil |
Nil |
Nil |
|
23 |
Replacement of meters |
Nil |
Nil |
Nil |
|
23 |
Interruption of supply |
Nil |
Nil |
Nil |
|
24 |
Voltage fluctuations and complaints |
Nil |
Nil |
Nil |
|
24 |
Responding to consumer's complaints |
Nil |
Nil |
Nil |
|
25 |
Grievance Handling |
|
|
|
|
TOTAL |
|
|
|
|
BHJ |
25 |
Duty to provide supply |
Rs. 50 per
day of delay from the limit specified in the performance regulations |
0.00 |
0.00 |
|
a) New
Connection |
0.00 |
0.00 |
|
b)
Additional Load |
0.00 |
0.00 |
|
c)
Temporary supply |
0.00 |
0.00 |
|
d) Shifting service connection |
0.00 |
0.00 |
|
e)Transfer of service connection |
0.00 |
0.00 |
|
f) Change in tariff category of consumer |
0.00 |
0.00 |
|
29 |
Complaints in billing |
Rs. 50 for non reply within the period prescribed in Regulations |
0.00 |
0.00 |
|
29 |
Replacement of meters |
LT- Rs. 25 per day of delay - maximum Rs.2,500 and HT - Rs. 250
per day of delay - maximum of Rs.5,000 |
0.00 |
0.00 |
|
30 |
Interruption of supply |
LT- Rs. 25 for every 6 hrs of delay- maximum of Rs. 500 and HT-
Rs. 50 for every 6 hrs delay- maximum Rs. 1000/- |
0.00 |
0.00 |
|
30 |
Voltage fluctuations and complaints |
Rs. 50 for failure to visit or convey findings within the
stipulated period |
0.00 |
0.00 |
|
31 |
Responding to consumer's complaints |
Rs. 25 for each day of delay- maximum Rs. 500 |
0.00 |
0.00 |
|
31 |
Grievance Handling |
Rs.25 for failure in handling grievance |
0.00 |
0.00 |
|
TOTAL |
|
|
|
|
JND |
32 |
Duty to provide supply |
Nil |
Nil |
Nil |
|
a) New
Connection |
|
b)
Additional Load |
|
c)
Temporary supply |
|
d) Shifting service connection |
|
e)Transfer of service connection |
|
f) Change in tariff category of consumer |
|
35 |
Complaints in billing |
Nil |
Nil |
Nil |
|
35 |
Replacement of meters |
Nil |
Nil |
Nil |
|
36 |
Interruption of supply |
Nil |
Nil |
Nil |
|
36 |
Voltage fluctuations and complaints |
Nil |
Nil |
Nil |
|
37 |
Responding to consumer's complaints |
Nil |
Nil |
Nil |
|
37 |
Grievance Handling |
|
|
|
|
TOTAL |
|
|
|
|
BVN |
38 |
Duty to provide supply |
Rs. 50 per day of delay from the limit specified in the
performance regulations |
|
|
|
a) New
Connection |
|
|
|
b)
Additional Load |
|
|
|
c)
Temporary supply |
|
|
|
d) Shifting service connection |
|
|
|
e)Transfer of service connection |
|
|
|
f) Change in tariff category of consumer |
|
|
|
41 |
Complaints in billing |
Rs. 50 for non reply
within the period prescribed in Regulations |
|
|
|
42 |
Replacement of meters |
LT- Rs. 25 per day
of delay - maximum Rs.2,500 and HT - Rs. 250 per day of delay - maximum of
Rs.5,000 |
|
|
|
42 |
Interruption of supply |
LT- Rs. 25 for every
6 hrs of delay- maximum of Rs. 500 and HT- Rs. 50 for every 6 hrs delay-
maximum Rs. 1000/- |
|
|
|
43 |
Voltage fluctuations and complaints |
Rs. 50 for failure
to visit or convey findings within the stipulated period |
|
|
|
43 |
Responding to consumer's complaints |
Rs. 25 for each day
of delay- maximum Rs. 500 |
|
|
|
44 |
Grievance Handling |
Rs.25 for failure in
handling grievance |
|
|
|
TOTAL |
|
|
|
|
AMR |
44 |
Duty to provide supply |
|
|
|
|
a) New
Connection |
|
|
|
b)
Additional Load |
|
|
|
c)
Temporary supply |
|
|
|
d) Shifting service connection |
|
|
|
e)Transfer of service connection |
|
|
|
f) Change in tariff category of consumer |
|
|
|
48 |
Complaints in billing |
|
|
|
|
48 |
Replacement of meters |
|
|
|
|
49 |
Interruption of supply |
|
|
|
|
49 |
Voltage fluctuations and complaints |
|
|
|
|
50 |
Responding to consumer's complaints |
|
|
|
|
50 |
Grievance Handling |
|
|
|
|
TOTAL |
|
|
|
|
SNR |
50 |
Duty to provide supply |
Rs. 50 per day of delay from the limit specified
in the performance regulations |
Nil |
|
a) New
Connection |
|
|
|
b)
Additional Load |
|
|
|
c)
Temporary supply |
|
|
|
d) Shifting service connection |
|
|
|
e)Transfer of service connection |
|
|
|
f) Change in tariff category of consumer |
|
|
|
54 |
Complaints in billing |
Rs. 50 for non reply
within the period prescribed in Regulations |
|
|
|
54 |
Replacement of meters |
LT- Rs. 25 per day
of delay - maximum Rs.2,500 and HT - Rs. 250 per day of delay - maximum of
Rs.5,000 |
|
|
|
55 |
Interruption of supply |
LT- Rs. 25 for every
6 hrs of delay- maximum of Rs. 500 and HT- Rs. 50 for every 6 hrs delay-
maximum Rs. 1000/- |
|
|
|
55 |
Voltage fluctuations and complaints |
Rs. 50 for failure
to visit or convey findings within the stipulated period |
|
|
|
56 |
Responding to consumer's complaints |
Rs. 25 for each day
of delay- maximum Rs. 500 |
|
|
|
56 |
Grievance Handling |
Rs.25 for failure in
handling grievance |
|
|
|
TOTAL |
|
|
|
|
PGVCL |
57 |
Duty
to provide supply |
Rs. 50 per
day of delay from the limit specified in the performance regulations |
N I L |
|
a) New Connection |
|
b) Additional Load |
|
c) Temporary supply |
|
d) Shifting service connection |
|
e)Transfer of service
connection |
|
f) Change in tariff category of
consumer |
|
60 |
Complaints in billing |
Rs. 50 for non reply within the period prescribed in Regulations |
|
61 |
Replacement of meters |
LT- Rs. 25 per day of delay - maximum Rs.2,500 and HT - Rs. 250
per day of delay - maximum of Rs.5,001 |
|
61 |
Interruption of supply |
LT- Rs. 25 for every 6 hrs of delay- maximum of Rs. 500 and HT-
Rs. 50 for every 6 hrs delay- maximum Rs. 1000/- |
|
62 |
Voltage fluctuations and complaints |
Rs. 50 for failure to visit or convey findings within the
stipulated period |
|
62 |
Responding to consumer's complaints |
Rs. 25 for each day of delay- maximum Rs. 501 |
|
63 |
Grievance Handling |
Rs.25 for failure in handling grievance |
|
TOTAL |
|
|
|
|
|
|
|
|
|
|
|
|
|
|