Performa SoP 003 B: APPENDIX-B (already in the SoP regulation)
REGISTER FOR COMPILING THE COMPLAINTS CLASSIFICATIONWISE
Name of Area / Circle Classification Pending complaints of previous Qtr Complaints received during the Qtr Total Complaints No. of Complaints redressed during the Qtr Balance Complaints to be redressed
(5)-(10)
In stipulated time Beyond stipulated time Total (6) to (9)
Within 50% of stipulated time. Within stipulated time. Up to double the stipulated time More than double the stipulated time
1 2   3 4 5 6 7 8 9 10 11  
PGVCL A(i) Loose connections from pole 24 89078 89102 56323 32028 710 17 89078 24
A(ii) Interruption due to line breakdown 12 62858 62870 32235 29867 739 25 62866 4
A(iii) Interruption due to failure of transformer 26 22387 22413 10346 11177 854 16 22393 20
B(i) Ordinary case, which requires no augmentation. 15 2604 2619 1111 1473 13 5 2602 17
B(ii) Where augmentation is required. 6 1479 1485 630 834 12 3 1479 6
C(i) Stopped/Defective Meters 20 15277 15297 7442 7690 131 13 15276 21
C(ii) Billing on average basis for more than two bills 19 7461 7480 4288 3045 105 23 7461 19
D(i) Loose Wires 24 12952 12976 7213 5508 208 20 12949 27
D(ii) Inadequate ground clearance 1 2167 2168 961 1153 45 8 2167 1
E(i) For current bills where no additional information is required 4 4963 4967 2792 2088 77 6 4963 4
E(ii) Where additional information relating to correctness of reading etc. is required 9 5021 5030 1866 3109 38 8 5021 9
F(i) Where extension of mains is not required 2 2356 2358 1288 1019 42 7 2356 2
F(ii) Where extension of mains is required 1 1373 1374 671 645 53 4 1373 1
F(iii) Modification in connected load 12 3204 3216 1647 1472 78 7 3204 12
F(iv) Name change/reconnection 11 7683 7694 4150 3493 30 6 7679 15
G Refund of amount due in regard to temporary connection 13 1703 1716 650 1045 9 3 1707 9
H Others 9 23029 23038 11722 10863 188 10 22783 255
Total 208.00 265595.00 265803.00 145335.00 116509.00 3332.00 181.00 265357.00 446.00