REGISTER FOR COMPILING THE COMPLAINTS CLASSIFICATIONWISE
Name of Area / Circle Classification   Pending complaints of previous Qtr Complaints received during the Qtr Total Complaints No. of Complaints redressed during the Qtr Balance Complaints to be redressed
(5) – (10)
In stipulated time Beyond stipulated time Total (6) to (9)
Within 50% of stipulated time. Within stipulated time. Up to double the stipulated time More than double the stipulated time
1 2   3 4 5 6 7 8 9 10 11  
PGVCL A(i) Loose connections from pole 59746 61974 121720 47262 40993 118 1 86112 35608
A(ii) Interruption due to line breakdown 12135 14800 26935 12719 9286 34 0 20696 6239
A(iii) Interruption due to failure of transformer 6024 6131 12155 5777 4060 1 0 9649 2507
B(i) Ordinary case, which requires no augmentation. 2994 1819 4813 2036 853 0 0 2834 1979
B(ii) Where augmentation is required. 920 835 1755 944 652 0 0 1580 175
C(i) Stopped/Defective Meters 9688 8946 18634 8509 7263 59 0 15723 2911
C(ii) Billing on average basis for more than two bills 3194 3466 6660 2703 2956 4 0 5585 1075
D(i) Loose Wires 4136 3592 7728 4238 1851 66 0 6083 1645
D(ii) Inadequate ground clearance 1221 1164 2385 1370 738 0 0 2094 291
E(i) For current bills where no additional information is required 5607 5989 11596 4716 5332 0 0 10081 1515
E(ii) Where additional information relating to correctness of reading etc. is required 2266 2825 5091 2185 2641 0 0 4828 263
F(i) Where extension of mains is not required 2912 3300 6212 3239 2234 25 0 5500 712
F(ii) Where extension of mains is required 2546 2698 5244 2660 2300 0 0 4933 311
F(iii) Modification in connected load 1657 2001 3658 2083 1222 0 0 3280 378
F(iv) Name change/reconnection 7768 5998 13766 6541 4624 30 0 10971 2795
G Refund of amount due in regard to temporary connection 891 1158 2049 1060 725 0 0 1779 270
H Others 1571 1790 3361 2245 831 0 0 3042 319