Performa SoP 003 B: APPENDIX-B (already in the SoP regulation)
REGISTER FOR COMPILING THE COMPLAINTS CLASSIFICATIONWISE
Name of Area / Circle Classification Pending complaints of previous Qtr Complaints received during the Qtr Total Complaints No. of Complaints redressed during the Qtr Balance Complaints to be redressed
(5) – (10)
In stipulated time Beyond stipulated time Total (6) to (9)
Within 50% of stipulated time. Within stipulated time. Up to double the stipulated time More than double the stipulated time
1 2 3 4 5 6 7 8 9 10 11      
PGVCL A(i) Loose connections from pole 25 64635 63700 32313 29281 2100 0 63694 6
A(ii) Interruption due to line breakdown 117 12614 12655 6356 5655 314 1 12326 329
A(iii) Interruption due to failure of transformer 147 6463 6507 2878 3238 248 0 6364 144
B(i) Ordinary case, which requires no augmentation. 28 4905 4912 3379 1516 10 0 4905 7
B(ii) Where augmentation is required. 14 856 864 276 541 24 0 841 23
C(i) Stopped/Defective Meters 271 9253 9364 3199 5794 260 0 9253 111
C(ii) Billing on average basis for more than two bills 26 3325 3325 1411 1836 78 0 3325 0
D(i) Loose Wires 112 4498 4542 1641 2720 137 0 4498 44
D(ii) Inadequate ground clearance 15 951 951 394 539 18 0 951 0
E(i) For current bills where no additional information is required 0 4934 4889 2077 2768 44 0 4889 0
E(ii) Where additional information relating to correctness of reading etc. is required 177 1955 1976 1170 767 18 0 1955 21
F(i) Where extension of mains is not required 0 3300 3430 1530 1854 45 0 3430 1
F(ii) Where extension of mains is required 18 2443 2588 666 1907 15 0 2588 0
F(iii) Modification in connected load 81 1589 1635 665 911 13 0 1589 46
F(iv) Name change/reconnection 828 10998 11135 5339 5482 210 0 11031 104
G Refund of amount due in regard to temporary connection 66 694 703 359 311 18 0 687 16
H Others 25 1441 1442 905 520 16 0 1441 1