Performa SoP 013: Meter faults
Name of Area/Circle Consumer Category No. of faulty meters at the start of the quarter / year No. of faulty meters added during the quarter / year      Total no. of defective / faulty Meter No. of faulty Meters repaired and replaced No of faulty meters pending at the end of the quarter 
    [1] [2] (3)=(2)+(1) [4] (5)=(3)-(4)
PGVCL Single Phase 54224 40926 95150 43536 51614
Three Phase 1248 7428 8676 5364 3312
HT 2 8 10 10 0