Performa SoP 003 B: APPENDIX-B (already in the SoP regulation)
REGISTER FOR COMPILING THE COMPLAINTS CLASSIFICATIONWISE
Name of Area / Circle Classification Pending complaints of previous Qtr Complaints received during the Qtr Total Complaints No. of Complaints redressed during the Qtr Balance Complaints to be redressed
(5) – (10)
In stipulated time Beyond stipulated time Total (6) to (9)
Within 50% of stipulated time. Within stipulated time. Up to double the stipulated time More than double the stipulated time
1 2 3 4 5 6 7 8 9 10 11  
PGVCL A(i) Loose connections from pole 1 54042 54043 28775 25082 127 2 53986 57
A(ii) Interruption due to line breakdown 1 17045 17046 7790 9169 74 0 17033 13
A(iii) Interruption due to failure of transformer 0 8328 8328 3995 4267 50 10 8322 6
B(i) Ordinary case, which requires no augmentation. 0 1586 1586 687 872 18 8 1585 1
B(ii) Where augmentation is required. 0 1121 1121 506 595 20 0 1121 0
C(i) Stopped/Defective Meters 6 11780 11786 4977 6634 83 0 11694 92
C(ii) Billing on average basis for more than two bills 5 5288 5293 2153 3052 10 0 5215 78
D(i) Loose Wires 6 5491 5497 2943 2499 44 4 5490 7
D(ii) Inadequate ground clearance 3 1401 1404 586 771 42 0 1399 5
E(i) For current bills where no additional information is required 5 5433 5438 1940 3436 13 0 5389 49
E(ii) Where additional information relating to correctness of reading etc. is required 3 4078 4081 1154 2904 14 0 4072 9
F(i) Where extension of mains is not required 1 2796 2797 1342 1420 32 0 2794 3
F(ii) Where extension of mains is required 1 1212 1213 480 726 7 0 1213 0
F(iii) Modification in connected load 1 2320 2321 1013 1216 49 23 2301 20
F(iv) Name change/reconnection 58 7429 7487 3119 4193 55 15 7382 105
G Refund of amount due in regard to temporary connection 217 1108 1325 430 632 14 1 1077 248
H Others 22 3714 3736 2097 1607 10 0 3714 22