Performa SoP 003 B: APPENDIX-B (already in the SoP regulation)
REGISTER FOR COMPILING THE COMPLAINTS CLASSIFICATIONWISE
Name of Area / Circle Classification Pending complaints of previous Qtr Complaints received during the Qtr Total Complaints No. of Complaints redressed during the Qtr         Balance Complaints to be redressed
(5) – (10)
            In stipulated time   Beyond stipulated time   Total (6) to (9)  
            Within 50% of stipulated time. Within stipulated time. Up to double the stipulated time More than double the stipulated time    
1 2   3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00 11.00  
1 A(i) Loose connections from pole 29.00 123507.00 123536.00 79112.00 43886.00 449.00 48.00 123495.00 41.00
  A(ii) Interruption due to line breakdown 17.00 71816.00 71833.00 38573.00 32778.00 417.00 37.00 71805.00 28.00
  A(iii) Interruption due to failure of transformer 31.00 32167.00 32198.00 19142.00 12220.00 770.00 18.00 32150.00 48.00
  B(i) Ordinary case, which requires no augmentation. 17.00 2522.00 2539.00 937.00 1554.00 30.00 0.00 2521.00 18.00
  B(ii) Where augmentation is required. 36.00 1398.00 1434.00 553.00 798.00 39.00 7.00 1397.00 37.00
  C(i) Stopped/Defective Meters 25.00 17490.00 17515.00 8964.00 8429.00 76.00 12.00 17481.00 34.00
  C(ii) Billing on average basis for more than two bills 18.00 7504.00 7522.00 4298.00 3085.00 113.00 7.00 7503.00 19.00
  D(i) Loose Wires 26.00 14029.00 14055.00 8232.00 5719.00 64.00 5.00 14020.00 35.00
  D(ii) Inadequate ground clearance 1.00 2013.00 2014.00 895.00 1046.00 65.00 7.00 2013.00 1.00
  E(i) For current bills where no additional information is required 4.00 5120.00 5124.00 3282.00 1780.00 47.00 10.00 5119.00 5.00
  E(ii) Where additional information relating to correctness of reading etc. is required 10.00 4334.00 4344.00 1578.00 2740.00 12.00 4.00 4334.00 10.00
  F(i) Where extension of mains is not required 2.00 2386.00 2388.00 1313.00 1046.00 23.00 3.00 2385.00 3.00
  F(ii) Where extension of mains is required 1.00 1377.00 1378.00 609.00 752.00 13.00 2.00 1376.00 2.00
  F(iii) Modification in connected load 12.00 3306.00 3318.00 1508.00 1739.00 53.00 6.00 3306.00 12.00
  F(iv) Name change/reconnection 14.00 7051.00 7065.00 3429.00 3566.00 49.00 5.00 7049.00 16.00
  G Refund of amount due in regard to temporary connection 9.00 2078.00 2087.00 1096.00 960.00 21.00 0.00 2077.00 10.00
  H Others 7.00 28824.00 28831.00 17311.00 11106.00 145.00 10.00 28572.00 259.00
2 A(i) Loose connections from pole 41.00 130238.00 130279.00 86432.00 43271.00 500.00 32.00 130235.00 44.00
  A(ii) Interruption due to line breakdown 28.00 89907.00 89935.00 48271.00 41161.00 440.00 33.00 89905.00 30.00
  A(iii) Interruption due to failure of transformer 48.00 32528.00 32576.00 16614.00 14806.00 836.00 260.00 32516.00 60.00
  B(i) Ordinary case, which requires no augmentation. 18.00 3427.00 3445.00 1855.00 1458.00 75.00 28.00 3416.00 29.00
  B(ii) Where augmentation is required. 37.00 2007.00 2044.00 983.00 926.00 85.00 7.00 2001.00 43.00
  C(i) Stopped/Defective Meters 34.00 21398.00 21432.00 11745.00 9529.00 85.00 30.00 21389.00 43.00
  C(ii) Billing on average basis for more than two bills 19.00 9171.00 9190.00 5872.00 3064.00 161.00 60.00 9157.00 33.00
  D(i) Loose Wires 35.00 15575.00 15610.00 8849.00 6626.00 82.00 10.00 15567.00 43.00
  D(ii) Inadequate ground clearance 1.00 4282.00 4283.00 2338.00 1718.00 219.00 7.00 4282.00 1.00
  E(i) For current bills where no additional information is required 5.00 5127.00 5132.00 2930.00 2093.00 84.00 17.00 5124.00 8.00
  E(ii) Where additional information relating to correctness of reading etc. is required 10.00 5301.00 5311.00 3160.00 2009.00 69.00 62.00 5300.00 11.00
  F(i) Where extension of mains is not required 3.00 2792.00 2795.00 1823.00 928.00 38.00 3.00 2792.00 3.00
  F(ii) Where extension of mains is required 2.00 2115.00 2117.00 1177.00 858.00 71.00 6.00 2112.00 5.00
  F(iii) Modification in connected load 12.00 4306.00 4318.00 2435.00 1785.00 73.00 7.00 4300.00 18.00
  F(iv) Name change/reconnection 16.00 8101.00 8117.00 4515.00 3489.00 62.00 34.00 8100.00 17.00
  G Refund of amount due in regard to temporary connection 10.00 2601.00 2611.00 1320.00 1248.00 21.00 5.00 2594.00 17.00
  H Others 259.00 22434.00 22693.00 12671.00 9309.00 224.00 234.00 22438.00 255.00
3 A(i) Loose connections from pole 44.00 101583.00 101627.00 66616.00 34601.00 316.00 48.00 101581.00 46.00
  A(ii) Interruption due to line breakdown 30.00 92594.00 92624.00 57652.00 34643.00 259.00 37.00 92591.00 33.00
  A(iii) Interruption due to failure of transformer 60.00 21747.00 21807.00 11600.00 9658.00 466.00 18.00 21742.00 65.00
  B(i) Ordinary case, which requires no augmentation. 29.00 2043.00 2072.00 1013.00 999.00 30.00 0.00 2042.00 30.00
  B(ii) Where augmentation is required. 43.00 1155.00 1198.00 445.00 666.00 39.00 7.00 1157.00 41.00
  C(i) Stopped/Defective Meters 43.00 18899.00 18942.00 10256.00 8572.00 56.00 12.00 18896.00 46.00
  C(ii) Billing on average basis for more than two bills 33.00 6928.00 6961.00 4169.00 2668.00 83.00 7.00 6927.00 34.00
  D(i) Loose Wires 43.00 15526.00 15569.00 10586.00 4889.00 49.00 5.00 15529.00 40.00
  D(ii) Inadequate ground clearance 1.00 1703.00 1704.00 879.00 772.00 34.00 7.00 1692.00 12.00
  E(i) For current bills where no additional information is required 8.00 4251.00 4259.00 2514.00 1697.00 32.00 10.00 4253.00 6.00
  E(ii) Where additional information relating to correctness of reading etc. is required 11.00 3569.00 3580.00 2036.00 1518.00 10.00 4.00 3568.00 12.00
  F(i) Where extension of mains is not required 3.00 6950.00 6953.00 4768.00 2156.00 23.00 3.00 6950.00 3.00
  F(ii) Where extension of mains is required 5.00 926.00 931.00 408.00 507.00 12.00 2.00 929.00 2.00
  F(iii) Modification in connected load 18.00 3115.00 3133.00 1642.00 1423.00 44.00 6.00 3115.00 18.00
  F(iv) Name change/reconnection 17.00 7067.00 7084.00 3993.00 3049.00 20.00 5.00 7067.00 17.00
  G Refund of amount due in regard to temporary connection 17.00 1743.00 1760.00 729.00 993.00 21.00 0.00 1743.00 17.00
  H Others 255.00 38808.00 39063.00 24621.00 14031.00 138.00 15.00 38805.00 258.00
4 A(i) Loose connections from pole 46.00 92580.00 90597.00 54184.00 37864.00 477.00 48.00 92573.00 53.00
  A(ii) Interruption due to line breakdown 33.00 73050.00 71582.00 37102.00 35464.00 443.00 37.00 73046.00 37.00
  A(iii) Interruption due to failure of transformer 65.00 18546.00 17696.00 9650.00 8091.00 789.00 16.00 18546.00 65.00
  B(i) Ordinary case, which requires no augmentation. 30.00 2573.00 2529.00 1395.00 1152.00 25.00 0.00 2572.00 31.00
  B(ii) Where augmentation is required. 41.00 1197.00 1125.00 496.00 657.00 37.00 7.00 1197.00 41.00
  C(i) Stopped/Defective Meters 46.00 19382.00 18689.00 10522.00 8768.00 91.00 8.00 19389.00 39.00
  C(ii) Billing on average basis for more than two bills 34.00 8482.00 7853.00 5739.00 2625.00 114.00 7.00 8485.00 31.00
  D(i) Loose Wires 40.00 13460.00 12825.00 9234.00 4148.00 71.00 4.00 13457.00 43.00
  D(ii) Inadequate ground clearance 12.00 1739.00 1751.00 889.00 816.00 37.00 7.00 1749.00 2.00
  E(i) For current bills where no additional information is required 6.00 4576.00 4075.00 2701.00 1817.00 48.00 10.00 4576.00 6.00
  E(ii) Where additional information relating to correctness of reading etc. is required 12.00 4438.00 4009.00 2857.00 1562.00 14.00 4.00 4437.00 13.00
  F(i) Where extension of mains is not required 3.00 2226.00 2135.00 1326.00 861.00 35.00 3.00 2225.00 4.00
  F(ii) Where extension of mains is required 2.00 1330.00 1317.00 576.00 727.00 25.00 2.00 1330.00 2.00
  F(iii) Modification in connected load 18.00 4162.00 3861.00 2355.00 1743.00 56.00 6.00 4160.00 20.00
  F(iv) Name change/reconnection 17.00 7623.00 7227.00 4575.00 3018.00 25.00 5.00 7623.00 17.00
  G Refund of amount due in regard to temporary connection 17.00 1907.00 1892.00 929.00 956.00 23.00 0.00 1908.00 16.00
  H Others 258.00 25668.00 22980.00 12127.00 13375.00 155.00 8.00 25665.00 261.00
680.00 282939.00 272143.00 156657.00 123644.00 2465.00 172.00 282938.00 681.00