Performa SoP 003 B: APPENDIX-B (already in the SoP regulation)
REGISTER FOR COMPILING THE COMPLAINTS CLASSIFICATIONWISE
Name of Area / Circle Classification Pending complaints of previous Qtr Complaints received during the Qtr Total Complaints No. of Complaints redressed during the Qtr Balance Complaints to be redressed
(5) – (10)
In stipulated time Beyond stipulated time Total (6) to (9)
Within 50% of stipulated time. Within stipulated time. Up to double the stipulated time More than double the stipulated time
1 2 3 4 5 6 7 8 9 10 11    
PGVCL A(i) Loose connections from pole 59746 250635 310381 177970 131669 633 52 310324 57
A(ii) Interruption due to line breakdown 12135 70428 82563 41801 40488 239 22 82550 13
A(iii) Interruption due to failure of transformer 6024 31793 37817 19600 18019 157 35 37811 6
B(i) Ordinary case, which requires no augmentation. 2994 6761 9755 5969 3661 96 28 9754 1
B(ii) Where augmentation is required. 920 4079 4999 2460 2496 43 0 4999 0
C(i) Stopped/Defective Meters 9688 43144 52832 25624 26829 286 1 52740 92
C(ii) Billing on average basis for more than two bills 3194 17313 20507 9236 11157 32 4 20429 78
D(i) Loose Wires 4136 19403 23539 13484 9813 227 8 23532 7
D(ii) Inadequate ground clearance 1221 5577 6798 3396 3309 88 0 6793 5
E(i) For current bills where no additional information is required 5607 18967 24574 9984 14509 32 0 24525 49
E(ii) Where additional information relating to correctness of reading etc. is required 2266 13187 15453 5401 10017 26 0 15444 9
F(i) Where extension of mains is not required 2912 11122 14034 7420 6456 153 2 14031 3
F(ii) Where extension of mains is required 2546 6287 8833 4261 4560 12 0 8833 0
F(iii) Modification in connected load 1657 8834 10491 5475 4851 99 46 10471 20
F(iv) Name change/reconnection 7768 28516 36284 17564 18400 185 30 36179 105
G Refund of amount due in regard to temporary connection 891 4440 5331 2446 2606 29 2 5083 248