BHAVNAGAR FORUM JUDGEMENT APR-2005 TO MAR-2016
NATURE OF COMPLIANT DOWN LOAD
1.     Agriculture:
(a)          New connections. CLICK HERE
(b)          Estimate related. CLICK HERE
(c)          Second connection in the same Land Survey Number.  
(d)          Extension/Reduction in contract demand. CLICK HERE
(e)          Shifting. CLICK HERE
(f)           Change of name. CLICK HERE
(g)          Shifting with change of name. CLICK HERE
(h)         PDC – RC. CLICK HERE
(i)           PDC-RC with shifting. CLICK HERE
(j)           PDC RC with shifting + change of name. CLICK HERE
(k)        Other purpose connection on Ag. Land. CLICK HERE
(l)           Poultry Farm related.  
(m)        Farm House related.  
(n)         Shifting of transformer. CLICK HERE
(o)          Shifting of bore/well.  
   
2.  RGP/LTMD/NRGP.
(a) New connections. CLICK HERE
(b) Change of name. CLICK HERE
(c) Space for transformer. CLICK HERE
(d) Infrastructure recovery.  
(e) Extension/Reduction in contract demand. CLICK HERE
(f) Estimate related. CLICK HERE
(g) Disconnection. CLICK HERE
   
3.  HT/EHT CONNECTION.
(a)  New connection. CLICK HERE
(b)  Load extension/reduction. CLICK HERE
(c)  Estimate related. CLICK HERE
(d)  Billing related. CLICK HERE
(e)  Violation of HTPIV tariff. CLICK HERE
(f)   Amalgamation of HT connection.  
(g)  Final bill related. CLICK HERE
   
4.  LICENSEE SERVICE RELATED
(a)  Interruption in power supply/Voltage fluctuations. CLICK HERE
(b)  Late service for new connection/shifting/Name change. CLICK HERE
(c)  Safety related. CLICK HERE
   
5.  COMPENSATION WHERE LICENSEE FAILED TO PERFORM AS PER SOP CLICK HERE
   
6.  ALL CATEGORIES(LT).
(a)  Energy billing related. CLICK HERE
(b)  Meter accuracy related. CLICK HERE
(c)  Burnt/damaged meter. CLICK HERE
(d)  Security Deposit. CLICK HERE
(e)  MF-2.  
   
7 CGRF JUDGEMENT (PERIOD)
All Judgements from the period March-2019 to till ) ...........  CLICK HERE