Ag catoery |
1A |
New connections. |
1B |
Estimate related. |
1D |
Extension/Reduction
in contract demand. |
1E |
Shifting. |
1F |
Change of name. |
1G |
Shifting with change
of name. |
1H |
PDC RC |
1I |
PDC RC with shifting. |
1J |
PDC RC with shifting
+ change of name. |
1K |
Other purpose
connection on Ag. Land. |
1L |
Poultry Farm related. |
1N |
Shifting of
transformer. |
2
RGP/LTMD/NRGP. |
|
2A |
New connections. |
2B |
Change of name. |
2C |
Space for
transformer. |
2D |
Infrastructure
recovery. |
2E |
Extension/Reduction
in contract demand. |
2F |
Estimate related. |
2G |
Disconnection. |
3 HT/EHT CONNECTION. |
|
3A |
New connection. |
3B |
Load
extension/reduction. |
3C |
Estimate related. |
3D |
Billing related. |
3F |
Amalgamation of HT
connection. |
4 LICENSEE
SERVICE RELATED. |
|
4A |
Interruption in power
supply/Voltage fluctuations. |
4B |
Late service for new
connection/shifting/Name change. |
4C |
Safety related. |
5 COMPENSATION
WHERE LICENSEE FAILED TO PERFORM AS PER SOP |
CLICK HERE |
6 ALL
CATEGORIES(LT). |
|
6A |
Energy billing
related. |
6B |
Meter accuracy
related. |
6C |
Burnt/damaged meter. |
6D |
Security Deposit. |
|
|