NATURE OF COMPLAINT OF CGRF RAJKOT DOWNLOAD
1  Agriculture:  
1A New connections.  
1B Estimate related.  
1D Extension/Reduction in contract demand.  
1E Shifting.  
1F Change of name.  
1G Shifting with change of name.  
1H PDC RC  
1I PDC RC with shifting.  
1J PDC RC with shifting + change of name.  
1K Other purpose connection on Ag. Land.  
1L Poultry Farm related.  
1N Shifting of transformer.  
2 RGP/LTMD/NRGP.  
2A New connections.  
2B Change of name.  
2C Space for transformer.  
2D Infrastructure recovery.  
2E Extension/Reduction in contract demand.  
2F Estimate related.  
2G Disconnection.  
3  HT/EHT CONNECTION.  
3A New connection.  
3B Load extension/reduction.  
3C Estimate related.  
3D Billing related.  
3F Amalgamation of HT connection.  
4 LICENSEE SERVICE RELATED.  
4A Interruption in power supply/Voltage fluctuations.  
4B Late service for new connection/shifting/Name change.  
4C Safety related.  
5 COMPENSATION WHERE LICENSEE FAILED TO PERFORM AS PER SOP  
6 ALL CATEGORIES(LT).  
6A Energy billing related.  
6B Meter accuracy related.  
6C Burnt/damaged meter.  
6D Security Deposit.  
     
7 CGRF JUDGEMENT (Bhuj Forum)  
ALL Judgement for the period of 01-April-2016 to 31-March-2020  
ALL Judgement for the period of 01-April-2020 to 31-December-2020  
ALL Judgement for the period of 01-January-2021 to 31-March-2021