NATURE OF COMPLAINT OF CGRF RAJKOT |
DOWNLOAD |
1 Agriculture: |
|
1A |
New connections. |
|
1B |
Estimate related. |
|
1D |
Extension/Reduction in contract demand. |
|
1E |
Shifting. |
|
1F |
Change of name. |
|
1G |
Shifting with change of name. |
|
1H |
PDC RC |
|
1I |
PDC RC with shifting. |
|
1J |
PDC RC with shifting + change of name. |
|
1K |
Other purpose connection on Ag. Land. |
|
1L |
Poultry Farm related. |
|
1N |
Shifting of transformer. |
|
2 RGP/LTMD/NRGP. |
|
2A |
New connections. |
|
2B |
Change of name. |
|
2C |
Space for transformer. |
|
2D |
Infrastructure recovery. |
|
2E |
Extension/Reduction in contract demand. |
|
2F |
Estimate related. |
|
2G |
Disconnection. |
|
3 HT/EHT
CONNECTION. |
|
3A |
New connection. |
|
3B |
Load extension/reduction. |
|
3C |
Estimate related. |
|
3D |
Billing related. |
|
3F |
Amalgamation of HT connection. |
|
4 LICENSEE SERVICE
RELATED. |
|
4A |
Interruption in power supply/Voltage fluctuations. |
|
4B |
Late service for new connection/shifting/Name change. |
|
4C |
Safety related. |
|
5 COMPENSATION
WHERE LICENSEE FAILED TO PERFORM AS PER SOP |
|
6 ALL
CATEGORIES(LT). |
|
6A |
Energy billing related. |
|
6B |
Meter accuracy related. |
|
6C |
Burnt/damaged meter. |
|
6D |
Security Deposit. |
|
|
|
|
7 CGRF JUDGEMENT
(Bhuj Forum) |
|
ALL |
Judgement for the period of 01-April-2016 to 31-March-2020 |
|
ALL |
Judgement for the period of 01-April-2020 to 31-December-2020 |
|
ALL |
Judgement for the period of 01-January-2021 to 31-March-2021 |
|
|
|
|